POWER EQUIPMENT OPERATOR: Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor Eagle, Garfield, G — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor Eagle, Garfield, Gs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 10 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor Eagle, Garfield, G is $28.70/hr, with the middle 80% of counties paying between $28.70 and $28.70/hr. The highest state average is Colorado at $28.70/hr; the lowest is Colorado at $28.70/hr.

Bottom 10%
$28.70
Median
$28.70
Average
$28.70
Top 10%
$28.70

Range: $28.70 – $28.70/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$28.70/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+1.7%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Colorado CO
Avg base: $22.72/hr
Avg total: $28.70/hr
10 rates

All Rates

10 county-level rates for POWER EQUIPMENT OPERATOR: Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor Eagle, Garfield, G, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Eagle CO highway $22.72 $5.98 $28.70 WD →
Garfield CO highway $22.72 $5.98 $28.70 WD →
Grand CO highway $22.72 $5.98 $28.70 WD →
Jackson CO highway $22.72 $5.98 $28.70 WD →
Lake CO highway $22.72 $5.98 $28.70 WD →
Moffat CO highway $22.72 $5.98 $28.70 WD →
Pitkin CO highway $22.72 $5.98 $28.70 WD →
Rio Blanco CO highway $22.72 $5.98 $28.70 WD →
Routt CO highway $22.72 $5.98 $28.70 WD →
Summit CO highway $22.72 $5.98 $28.70 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor Eagle, Garfield, G →