POWER EQUIPMENT OPERATOR: Concrete Texture Cure Machine — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: Concrete Texture Cure Machines across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 30 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: Concrete Texture Cure Machine is $11.11/hr, with the middle 80% of counties paying between $11.11 and $11.11/hr. The highest state average is Nebraska at $11.11/hr; the lowest is Nebraska at $11.11/hr.

Bottom 10%
$11.11
Median
$11.11
Average
$11.11
Top 10%
$11.11

Range: $11.11 – $11.11/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$11.11/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-60.6%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Nebraska NE
Avg base: $11.11/hr
Avg total: $11.11/hr
30 rates

All Rates

30 county-level rates for POWER EQUIPMENT OPERATOR: Concrete Texture Cure Machine, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Arthur NE highway $11.11 $0.00 $11.11 WD →
Banner NE highway $11.11 $0.00 $11.11 WD →
Box Butte NE highway $11.11 $0.00 $11.11 WD →
Chase NE highway $11.11 $0.00 $11.11 WD →
Cherry NE highway $11.11 $0.00 $11.11 WD →
Cheyenne NE highway $11.11 $0.00 $11.11 WD →
Dawes NE highway $11.11 $0.00 $11.11 WD →
Dawson NE highway $11.11 $0.00 $11.11 WD →
Deuel NE highway $11.11 $0.00 $11.11 WD →
Dundy NE highway $11.11 $0.00 $11.11 WD →
Frontier NE highway $11.11 $0.00 $11.11 WD →
Furnas NE highway $11.11 $0.00 $11.11 WD →
Garden NE highway $11.11 $0.00 $11.11 WD →
Gosper NE highway $11.11 $0.00 $11.11 WD →
Grant NE highway $11.11 $0.00 $11.11 WD →
Hayes NE highway $11.11 $0.00 $11.11 WD →
Hitchcock NE highway $11.11 $0.00 $11.11 WD →
Hooker NE highway $11.11 $0.00 $11.11 WD →
Keith NE highway $11.11 $0.00 $11.11 WD →
Kimball NE highway $11.11 $0.00 $11.11 WD →
Lincoln NE highway $11.11 $0.00 $11.11 WD →
Logan NE highway $11.11 $0.00 $11.11 WD →
McPherson NE highway $11.11 $0.00 $11.11 WD →
Morrill NE highway $11.11 $0.00 $11.11 WD →
Perkins NE highway $11.11 $0.00 $11.11 WD →
Red Willow NE highway $11.11 $0.00 $11.11 WD →
Scotts Bluff NE highway $11.11 $0.00 $11.11 WD →
Sheridan NE highway $11.11 $0.00 $11.11 WD →
Sioux NE highway $11.11 $0.00 $11.11 WD →
Thomas NE highway $11.11 $0.00 $11.11 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: Concrete Texture Cure Machine →