POWER EQUIPMENT OPERATOR: CONCRETE SCREED — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: CONCRETE SCREEDs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: CONCRETE SCREED is $33.90/hr, with the middle 80% of counties paying between $32.85 and $34.05/hr. The highest state average is Arizona at $33.74/hr; the lowest is Arizona at $33.74/hr.

Bottom 10%
$32.85
Median
$33.90
Average
$33.74
Top 10%
$34.05

Range: $32.85 – $34.05/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$33.90/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+20.1%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Arizona AZ
Avg base: $29.76/hr
Avg total: $33.74/hr
15 rates

All Rates

15 county-level rates for POWER EQUIPMENT OPERATOR: CONCRETE SCREED, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Apache AZ highway $33.90 $0.00 $33.90 WD →
Cochise AZ highway $26.41 $7.64 $34.05 WD →
Coconino AZ highway $25.70 $7.15 $32.85 WD →
Gila AZ highway $33.90 $0.00 $33.90 WD →
Graham AZ highway $33.90 $0.00 $33.90 WD →
Greenlee AZ highway $33.90 $0.00 $33.90 WD →
La Paz AZ highway $33.90 $0.00 $33.90 WD →
Maricopa AZ highway $26.41 $7.64 $34.05 WD →
Mohave AZ highway $25.70 $7.15 $32.85 WD →
Navajo AZ highway $33.90 $0.00 $33.90 WD →
Pima AZ highway $26.41 $7.64 $34.05 WD →
Pinal AZ highway $26.41 $7.64 $34.05 WD →
Santa Cruz AZ highway $33.90 $0.00 $33.90 WD →
Yavapai AZ highway $25.70 $7.15 $32.85 WD →
Yuma AZ highway $26.41 $7.64 $34.05 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: CONCRETE SCREED →