POWER EQUIPMENT OPERATOR: Concrete Saw Pittsburg County — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: Concrete Saw Pittsburg Countys across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 19 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: Concrete Saw Pittsburg County is $16.42/hr, with the middle 80% of counties paying between $16.42 and $16.42/hr. The highest state average is Oklahoma at $16.42/hr; the lowest is Oklahoma at $16.42/hr.

Bottom 10%
$16.42
Median
$16.42
Average
$16.42
Top 10%
$16.42

Range: $16.42 – $16.42/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$16.42/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-41.8%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Oklahoma OK
Avg base: $16.42/hr
Avg total: $16.42/hr
19 rates

All Rates

19 county-level rates for POWER EQUIPMENT OPERATOR: Concrete Saw Pittsburg County, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Atoka OK highway $16.42 $0.00 $16.42 WD →
Bryan OK highway $16.42 $0.00 $16.42 WD →
Carter OK highway $16.42 $0.00 $16.42 WD →
Choctaw OK highway $16.42 $0.00 $16.42 WD →
Coal OK highway $16.42 $0.00 $16.42 WD →
Garvin OK highway $16.42 $0.00 $16.42 WD →
Haskell OK highway $16.42 $0.00 $16.42 WD →
Hughes OK highway $16.42 $0.00 $16.42 WD →
Johnston OK highway $16.42 $0.00 $16.42 WD →
Latimer OK highway $16.42 $0.00 $16.42 WD →
Love OK highway $16.42 $0.00 $16.42 WD →
Marshall OK highway $16.42 $0.00 $16.42 WD →
McCurtain OK highway $16.42 $0.00 $16.42 WD →
Murray OK highway $16.42 $0.00 $16.42 WD →
Pittsburg OK highway $16.42 $0.00 $16.42 WD →
Pontotoc OK highway $16.42 $0.00 $16.42 WD →
Pottawatomie OK highway $16.42 $0.00 $16.42 WD →
Pushmataha OK highway $16.42 $0.00 $16.42 WD →
Seminole OK highway $16.42 $0.00 $16.42 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: Concrete Saw Pittsburg County →