POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTSs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS is $81.88/hr, with the middle 80% of counties paying between $81.88 and $81.88/hr. The highest state average is Indiana at $81.88/hr; the lowest is Indiana at $81.88/hr.

Bottom 10%
$81.88
Median
$81.88
Average
$81.88
Top 10%
$81.88

Range: $81.88 – $81.88/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$81.88/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+190%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $35.95/hr
Avg total: $81.88/hr
15 rates

All Rates

15 county-level rates for POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
La Porte IN building $35.95 $45.93 $81.88 WD →
La Porte IN highway $35.95 $45.93 $81.88 WD →
La Porte IN heavy $35.95 $45.93 $81.88 WD →
Lake IN heavy $35.95 $45.93 $81.88 WD →
Lake IN building $35.95 $45.93 $81.88 WD →
Lake IN highway $35.95 $45.93 $81.88 WD →
Porter IN heavy $35.95 $45.93 $81.88 WD →
Porter IN building $35.95 $45.93 $81.88 WD →
Porter IN highway $35.95 $45.93 $81.88 WD →
St Joseph IN heavy $35.95 $45.93 $81.88 WD →
St Joseph IN building $35.95 $45.93 $81.88 WD →
St Joseph IN building $35.95 $45.93 $81.88 WD →
St Joseph IN highway $35.95 $45.93 $81.88 WD →
St Joseph IN highway $35.95 $45.93 $81.88 WD →
St Joseph IN heavy $35.95 $45.93 $81.88 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS →