POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORI — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 72 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORI is $81.82/hr, with the middle 80% of counties paying between $81.82 and $81.82/hr. The highest state average is Alaska at $81.82/hr; the lowest is Alaska at $81.82/hr.

Bottom 10%
$81.82
Median
$81.82
Average
$81.82
Top 10%
$81.82

Range: $81.82 – $81.82/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$81.82/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+189.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Alaska AK
Avg base: $52.32/hr
Avg total: $81.82/hr
72 rates

All Rates

72 county-level rates for POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORI, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aleutians West AK residential $52.32 $29.50 $81.82 WD →
Aleutians West AK heavy $52.32 $29.50 $81.82 WD →
Aleutians West AK building $52.32 $29.50 $81.82 WD →
Anchorage AK heavy $52.32 $29.50 $81.82 WD →
Anchorage AK building $52.32 $29.50 $81.82 WD →
Bethel AK heavy $52.32 $29.50 $81.82 WD →
Bethel AK building $52.32 $29.50 $81.82 WD →
Bethel AK residential $52.32 $29.50 $81.82 WD →
Bristol Bay AK building $52.32 $29.50 $81.82 WD →
Bristol Bay AK heavy $52.32 $29.50 $81.82 WD →
Bristol Bay AK residential $52.32 $29.50 $81.82 WD →
Denali AK heavy $52.32 $29.50 $81.82 WD →
Denali AK building $52.32 $29.50 $81.82 WD →
Dillingham AK building $52.32 $29.50 $81.82 WD →
Dillingham AK heavy $52.32 $29.50 $81.82 WD →
Dillingham AK residential $52.32 $29.50 $81.82 WD →
Fairbanks North Star AK heavy $52.32 $29.50 $81.82 WD →
Fairbanks North Star AK building $52.32 $29.50 $81.82 WD →
Haines AK residential $52.32 $29.50 $81.82 WD →
Haines AK heavy $52.32 $29.50 $81.82 WD →
Haines AK building $52.32 $29.50 $81.82 WD →
Juneau AK residential $52.32 $29.50 $81.82 WD →
Juneau AK building $52.32 $29.50 $81.82 WD →
Juneau AK heavy $52.32 $29.50 $81.82 WD →
Kenai Peninsula AK residential $52.32 $29.50 $81.82 WD →
Kenai Peninsula AK heavy $52.32 $29.50 $81.82 WD →
Kenai Peninsula AK building $52.32 $29.50 $81.82 WD →
Ketchikan Gateway AK residential $52.32 $29.50 $81.82 WD →
Ketchikan Gateway AK building $52.32 $29.50 $81.82 WD →
Ketchikan Gateway AK heavy $52.32 $29.50 $81.82 WD →
Kodiak Island AK residential $52.32 $29.50 $81.82 WD →
Kodiak Island AK building $52.32 $29.50 $81.82 WD →
Kodiak Island AK heavy $52.32 $29.50 $81.82 WD →
Matanuska-Susitna AK building $52.32 $29.50 $81.82 WD →
Matanuska-Susitna AK building $52.32 $29.50 $81.82 WD →
Matanuska-Susitna AK residential $52.32 $29.50 $81.82 WD →
Matanuska-Susitna AK heavy $52.32 $29.50 $81.82 WD →
Matanuska-Susitna AK residential $52.32 $29.50 $81.82 WD →
Matanuska-Susitna AK heavy $52.32 $29.50 $81.82 WD →
Nome AK building $52.32 $29.50 $81.82 WD →
Nome AK heavy $52.32 $29.50 $81.82 WD →
North Slope AK building $52.32 $29.50 $81.82 WD →
North Slope AK heavy $52.32 $29.50 $81.82 WD →
Northwest Artic AK building $52.32 $29.50 $81.82 WD →
Northwest Artic AK heavy $52.32 $29.50 $81.82 WD →
Peninsula & Lake AK building $52.32 $29.50 $81.82 WD →
Peninsula & Lake AK heavy $52.32 $29.50 $81.82 WD →
Peninsula & Lake AK residential $52.32 $29.50 $81.82 WD →
Prince Of Wales-Outer Ketchika AK heavy $52.32 $29.50 $81.82 WD →
Prince Of Wales-Outer Ketchika AK building $52.32 $29.50 $81.82 WD →
Prince Of Wales-Outer Ketchika AK residential $52.32 $29.50 $81.82 WD →
Sitka AK building $52.32 $29.50 $81.82 WD →
Sitka AK residential $52.32 $29.50 $81.82 WD →
Sitka AK heavy $52.32 $29.50 $81.82 WD →
Skagway-Yakutat-Angoon AK heavy $52.32 $29.50 $81.82 WD →
Skagway-Yakutat-Angoon AK residential $52.32 $29.50 $81.82 WD →
Skagway-Yakutat-Angoon AK building $52.32 $29.50 $81.82 WD →
Southeast Fairbanks AK heavy $52.32 $29.50 $81.82 WD →
Southeast Fairbanks AK building $52.32 $29.50 $81.82 WD →
Southeast Fairbanks AK building $52.32 $29.50 $81.82 WD →
Southeast Fairbanks AK heavy $52.32 $29.50 $81.82 WD →
Valdez-Cordova AK residential $52.32 $29.50 $81.82 WD →
Valdez-Cordova AK heavy $52.32 $29.50 $81.82 WD →
Valdez-Cordova AK building $52.32 $29.50 $81.82 WD →
Wade Hampton AK building $52.32 $29.50 $81.82 WD →
Wade Hampton AK heavy $52.32 $29.50 $81.82 WD →
Wade Hampton AK residential $52.32 $29.50 $81.82 WD →
Wrangell-Petersburg AK residential $52.32 $29.50 $81.82 WD →
Wrangell-Petersburg AK heavy $52.32 $29.50 $81.82 WD →
Wrangell-Petersburg AK building $52.32 $29.50 $81.82 WD →
Yukon-Koyukuk AK heavy $52.32 $29.50 $81.82 WD →
Yukon-Koyukuk AK building $52.32 $29.50 $81.82 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORI →