POWER EQUIMENT OPERATORS: BACKHOE — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIMENT OPERATORS: BACKHOEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIMENT OPERATORS: BACKHOE is $6.30/hr, with the middle 80% of counties paying between $6.30 and $6.30/hr. The highest state average is American Samoa at $6.30/hr; the lowest is American Samoa at $6.30/hr.

Bottom 10%
$6.30
Median
$6.30
Average
$6.30
Top 10%
$6.30

Range: $6.30 – $6.30/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

American Samoa AS
Avg base: $6.30/hr
Avg total: $6.30/hr
20 rates

All Rates

20 county-level rates for POWER EQUIMENT OPERATORS: BACKHOE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Eastern AS building $6.30 $0.00 $6.30 WD →
Eastern AS heavy $6.30 $0.00 $6.30 WD →
Eastern AS highway $6.30 $0.00 $6.30 WD →
Eastern AS residential $6.30 $0.00 $6.30 WD →
Manu'a AS building $6.30 $0.00 $6.30 WD →
Manu'a AS residential $6.30 $0.00 $6.30 WD →
Manu'a AS heavy $6.30 $0.00 $6.30 WD →
Manu'a AS highway $6.30 $0.00 $6.30 WD →
Rose Island AS residential $6.30 $0.00 $6.30 WD →
Rose Island AS heavy $6.30 $0.00 $6.30 WD →
Rose Island AS highway $6.30 $0.00 $6.30 WD →
Rose Island AS building $6.30 $0.00 $6.30 WD →
Swains Island AS building $6.30 $0.00 $6.30 WD →
Swains Island AS heavy $6.30 $0.00 $6.30 WD →
Swains Island AS residential $6.30 $0.00 $6.30 WD →
Swains Island AS highway $6.30 $0.00 $6.30 WD →
Western AS residential $6.30 $0.00 $6.30 WD →
Western AS highway $6.30 $0.00 $6.30 WD →
Western AS heavy $6.30 $0.00 $6.30 WD →
Western AS building $6.30 $0.00 $6.30 WD →
Top-paying counties for POWER EQUIMENT OPERATORS: BACKHOE →