PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIE — Prevailing Wage Rates

Davis-Bacon prevailing wages for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 230 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIE is $68.65/hr, with the middle 80% of counties paying between $68.65 and $68.65/hr. The highest state average is Missouri at $68.65/hr; the lowest is Missouri at $68.65/hr.

Bottom 10%
$68.65
Median
$68.65
Average
$68.65
Top 10%
$68.65

Range: $68.65 – $68.65/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152Plumbers, Pipefitters, and Steamfitters.

Davis-Bacon median
$68.65/hr
National median total package (base + fringe)
BLS OEWS market median
$30.27/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+126.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Missouri MO
Avg base: $46.66/hr
Avg total: $68.65/hr
230 rates

All Rates

230 county-level rates for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adair MO heavy $46.66 $21.99 $68.65 WD →
Adair MO highway $46.66 $21.99 $68.65 WD →
Andrew MO highway $46.66 $21.99 $68.65 WD →
Andrew MO heavy $46.66 $21.99 $68.65 WD →
Atchison MO highway $46.66 $21.99 $68.65 WD →
Atchison MO heavy $46.66 $21.99 $68.65 WD →
Audrain MO highway $46.66 $21.99 $68.65 WD →
Audrain MO heavy $46.66 $21.99 $68.65 WD →
Barry MO heavy $46.66 $21.99 $68.65 WD →
Barry MO highway $46.66 $21.99 $68.65 WD →
Barton MO highway $46.66 $21.99 $68.65 WD →
Barton MO heavy $46.66 $21.99 $68.65 WD →
Bates MO highway $46.66 $21.99 $68.65 WD →
Bates MO heavy $46.66 $21.99 $68.65 WD →
Benton MO highway $46.66 $21.99 $68.65 WD →
Benton MO heavy $46.66 $21.99 $68.65 WD →
Bollinger MO heavy $46.66 $21.99 $68.65 WD →
Bollinger MO highway $46.66 $21.99 $68.65 WD →
Boone MO heavy $46.66 $21.99 $68.65 WD →
Boone MO highway $46.66 $21.99 $68.65 WD →
Buchanan MO heavy $46.66 $21.99 $68.65 WD →
Buchanan MO highway $46.66 $21.99 $68.65 WD →
Butler MO highway $46.66 $21.99 $68.65 WD →
Butler MO heavy $46.66 $21.99 $68.65 WD →
Caldwell MO highway $46.66 $21.99 $68.65 WD →
Caldwell MO heavy $46.66 $21.99 $68.65 WD →
Callaway MO heavy $46.66 $21.99 $68.65 WD →
Callaway MO highway $46.66 $21.99 $68.65 WD →
Camden MO heavy $46.66 $21.99 $68.65 WD →
Camden MO highway $46.66 $21.99 $68.65 WD →
Cape Girardeau MO highway $46.66 $21.99 $68.65 WD →
Cape Girardeau MO heavy $46.66 $21.99 $68.65 WD →
Carroll MO heavy $46.66 $21.99 $68.65 WD →
Carroll MO highway $46.66 $21.99 $68.65 WD →
Carter MO highway $46.66 $21.99 $68.65 WD →
Carter MO heavy $46.66 $21.99 $68.65 WD →
Cass MO highway $46.66 $21.99 $68.65 WD →
Cass MO heavy $46.66 $21.99 $68.65 WD →
Cedar MO highway $46.66 $21.99 $68.65 WD →
Cedar MO heavy $46.66 $21.99 $68.65 WD →
Chariton MO heavy $46.66 $21.99 $68.65 WD →
Chariton MO highway $46.66 $21.99 $68.65 WD →
Christian MO heavy $46.66 $21.99 $68.65 WD →
Christian MO highway $46.66 $21.99 $68.65 WD →
Clark MO highway $46.66 $21.99 $68.65 WD →
Clark MO heavy $46.66 $21.99 $68.65 WD →
Clay MO highway $46.66 $21.99 $68.65 WD →
Clay MO heavy $46.66 $21.99 $68.65 WD →
Clinton MO heavy $46.66 $21.99 $68.65 WD →
Clinton MO highway $46.66 $21.99 $68.65 WD →
Cole MO highway $46.66 $21.99 $68.65 WD →
Cole MO heavy $46.66 $21.99 $68.65 WD →
Cooper MO heavy $46.66 $21.99 $68.65 WD →
Cooper MO highway $46.66 $21.99 $68.65 WD →
Crawford MO heavy $46.66 $21.99 $68.65 WD →
Crawford MO highway $46.66 $21.99 $68.65 WD →
Dade MO highway $46.66 $21.99 $68.65 WD →
Dade MO heavy $46.66 $21.99 $68.65 WD →
Dallas MO highway $46.66 $21.99 $68.65 WD →
Dallas MO heavy $46.66 $21.99 $68.65 WD →
Daviess MO heavy $46.66 $21.99 $68.65 WD →
Daviess MO highway $46.66 $21.99 $68.65 WD →
De Kalb MO highway $46.66 $21.99 $68.65 WD →
De Kalb MO heavy $46.66 $21.99 $68.65 WD →
Dent MO highway $46.66 $21.99 $68.65 WD →
Dent MO heavy $46.66 $21.99 $68.65 WD →
Douglas MO highway $46.66 $21.99 $68.65 WD →
Douglas MO heavy $46.66 $21.99 $68.65 WD →
Dunklin MO heavy $46.66 $21.99 $68.65 WD →
Dunklin MO highway $46.66 $21.99 $68.65 WD →
Franklin MO highway $46.66 $21.99 $68.65 WD →
Franklin MO heavy $46.66 $21.99 $68.65 WD →
Gasconade MO highway $46.66 $21.99 $68.65 WD →
Gasconade MO heavy $46.66 $21.99 $68.65 WD →
Gentry MO heavy $46.66 $21.99 $68.65 WD →
Gentry MO highway $46.66 $21.99 $68.65 WD →
Greene MO highway $46.66 $21.99 $68.65 WD →
Greene MO heavy $46.66 $21.99 $68.65 WD →
Grundy MO highway $46.66 $21.99 $68.65 WD →
Grundy MO heavy $46.66 $21.99 $68.65 WD →
Harrison MO highway $46.66 $21.99 $68.65 WD →
Harrison MO heavy $46.66 $21.99 $68.65 WD →
Henry MO highway $46.66 $21.99 $68.65 WD →
Henry MO heavy $46.66 $21.99 $68.65 WD →
Hickory MO highway $46.66 $21.99 $68.65 WD →
Hickory MO heavy $46.66 $21.99 $68.65 WD →
Holt MO highway $46.66 $21.99 $68.65 WD →
Holt MO heavy $46.66 $21.99 $68.65 WD →
Howard MO highway $46.66 $21.99 $68.65 WD →
Howard MO heavy $46.66 $21.99 $68.65 WD →
Howell MO highway $46.66 $21.99 $68.65 WD →
Howell MO heavy $46.66 $21.99 $68.65 WD →
Iron MO highway $46.66 $21.99 $68.65 WD →
Iron MO heavy $46.66 $21.99 $68.65 WD →
Jackson MO highway $46.66 $21.99 $68.65 WD →
Jackson MO heavy $46.66 $21.99 $68.65 WD →
Jasper MO heavy $46.66 $21.99 $68.65 WD →
Jasper MO highway $46.66 $21.99 $68.65 WD →
Jefferson MO highway $46.66 $21.99 $68.65 WD →
Jefferson MO heavy $46.66 $21.99 $68.65 WD →
Top-paying counties for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIE →