PIPEFITTER (LAKE, LA PORTE, PORTER) — Prevailing Wage Rates

Davis-Bacon prevailing wages for PIPEFITTER (LAKE, LA PORTE, PORTER)s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PIPEFITTER (LAKE, LA PORTE, PORTER) is $79.62/hr, with the middle 80% of counties paying between $79.62 and $79.62/hr. The highest state average is Indiana at $79.62/hr; the lowest is Indiana at $79.62/hr.

Bottom 10%
$79.62
Median
$79.62
Average
$79.62
Top 10%
$79.62

Range: $79.62 – $79.62/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152Plumbers, Pipefitters, and Steamfitters.

Davis-Bacon median
$79.62/hr
National median total package (base + fringe)
BLS OEWS market median
$30.27/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+163%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $48.50/hr
Avg total: $79.62/hr
15 rates

All Rates

15 county-level rates for PIPEFITTER (LAKE, LA PORTE, PORTER), ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
La Porte IN building $48.50 $31.12 $79.62 WD →
La Porte IN highway $48.50 $31.12 $79.62 WD →
La Porte IN heavy $48.50 $31.12 $79.62 WD →
Lake IN heavy $48.50 $31.12 $79.62 WD →
Lake IN building $48.50 $31.12 $79.62 WD →
Lake IN highway $48.50 $31.12 $79.62 WD →
Porter IN heavy $48.50 $31.12 $79.62 WD →
Porter IN building $48.50 $31.12 $79.62 WD →
Porter IN highway $48.50 $31.12 $79.62 WD →
St Joseph IN heavy $48.50 $31.12 $79.62 WD →
St Joseph IN building $48.50 $31.12 $79.62 WD →
St Joseph IN building $48.50 $31.12 $79.62 WD →
St Joseph IN highway $48.50 $31.12 $79.62 WD →
St Joseph IN highway $48.50 $31.12 $79.62 WD →
St Joseph IN heavy $48.50 $31.12 $79.62 WD →
Top-paying counties for PIPEFITTER (LAKE, LA PORTE, PORTER) →