PIPEFITTER: INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION — Prevailing Wage Rates

Davis-Bacon prevailing wages for PIPEFITTER: INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATIONs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 24 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PIPEFITTER: INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION is $54.86/hr, with the middle 80% of counties paying between $52.68 and $57.03/hr. The highest state average is Oklahoma at $54.86/hr; the lowest is Oklahoma at $54.86/hr.

Bottom 10%
$52.68
Median
$54.86
Average
$54.86
Top 10%
$57.03

Range: $52.68 – $57.03/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152Plumbers, Pipefitters, and Steamfitters.

Davis-Bacon median
$54.86/hr
National median total package (base + fringe)
BLS OEWS market median
$30.27/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+81.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Oklahoma OK
Avg base: $38.83/hr
Avg total: $54.86/hr
24 rates

All Rates

24 county-level rates for PIPEFITTER: INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Coal OK building $41.00 $16.03 $57.03 WD →
Coal OK building $36.65 $16.03 $52.68 WD →
Garvin OK building $36.65 $16.03 $52.68 WD →
Garvin OK building $41.00 $16.03 $57.03 WD →
Haskell OK building $36.65 $16.03 $52.68 WD →
Haskell OK building $41.00 $16.03 $57.03 WD →
Hughes OK building $41.00 $16.03 $57.03 WD →
Hughes OK building $36.65 $16.03 $52.68 WD →
Latimer OK building $41.00 $16.03 $57.03 WD →
Latimer OK building $36.65 $16.03 $52.68 WD →
Marshall OK building $41.00 $16.03 $57.03 WD →
Marshall OK building $36.65 $16.03 $52.68 WD →
McCurtain OK building $41.00 $16.03 $57.03 WD →
McCurtain OK building $36.65 $16.03 $52.68 WD →
Pittsburg OK building $41.00 $16.03 $57.03 WD →
Pittsburg OK building $36.65 $16.03 $52.68 WD →
Pontotoc OK building $41.00 $16.03 $57.03 WD →
Pontotoc OK building $36.65 $16.03 $52.68 WD →
Pottawatomie OK building $36.65 $16.03 $52.68 WD →
Pottawatomie OK building $41.00 $16.03 $57.03 WD →
Pushmataha OK building $41.00 $16.03 $57.03 WD →
Pushmataha OK building $36.65 $16.03 $52.68 WD →
Seminole OK building $36.65 $16.03 $52.68 WD →
Seminole OK building $41.00 $16.03 $57.03 WD →
Top-paying counties for PIPEFITTER: INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION →