PIPEFITTER: HVAC PIPE INSTALLATION — Prevailing Wage Rates
Davis-Bacon prevailing wages for PIPEFITTER: HVAC PIPE INSTALLATIONs across all covered states and counties. Rates vary by location and construction type.
Across 28 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PIPEFITTER: HVAC PIPE INSTALLATION is $54.86/hr, with the middle 80% of counties paying between $52.68 and $57.03/hr. The highest state average is Oklahoma at $54.86/hr; the lowest is Oklahoma at $54.86/hr.
Range: $52.68 – $57.03/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152 — Plumbers, Pipefitters, and Steamfitters.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
28 county-level rates for PIPEFITTER: HVAC PIPE INSTALLATION, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Alfalfa | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Alfalfa | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Beaver | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Beaver | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Blaine | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Blaine | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Cimarron | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Cimarron | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Dewey | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Dewey | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Ellis | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Ellis | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Grant | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Grant | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Harper | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Harper | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Kay | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Kay | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Kingfisher | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Kingfisher | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Major | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Major | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Noble | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Noble | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Texas | OK | building | $36.65 | $16.03 | $52.68 | WD → |
| Texas | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Woodward | OK | building | $41.00 | $16.03 | $57.03 | WD → |
| Woodward | OK | building | $36.65 | $16.03 | $52.68 | WD → |