PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings — Prevailing Wage Rates

Davis-Bacon prevailing wages for PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatingss across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 4 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings is $17.83/hr, with the middle 80% of counties paying between $17.83 and $17.83/hr. The highest state average is California at $17.83/hr; the lowest is California at $17.83/hr.

Bottom 10%
$17.83
Median
$17.83
Average
$17.83
Top 10%
$17.83

Range: $17.83 – $17.83/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $14.31/hr
Avg total: $17.83/hr
4 rates

All Rates

4 county-level rates for PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Del Norte CA building $14.31 $3.52 $17.83 WD →
Humboldt CA building $14.31 $3.52 $17.83 WD →
Lake CA building $14.31 $3.52 $17.83 WD →
Mendocino CA building $14.31 $3.52 $17.83 WD →
Top-paying counties for PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings →