PAINTERS: BRIDGES WATERBLASTING UNITS WITH 3500 PSI AND ABOVE - $.50 PREMIUM SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND A — Prevailing Wage Rates

Davis-Bacon prevailing wages for PAINTERS: BRIDGES WATERBLASTING UNITS WITH 3500 PSI AND ABOVE - $.50 PREMIUM SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND As across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 30 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PAINTERS: BRIDGES WATERBLASTING UNITS WITH 3500 PSI AND ABOVE - $.50 PREMIUM SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND A is $47.10/hr, with the middle 80% of counties paying between $47.10 and $47.10/hr. The highest state average is Kentucky at $47.10/hr; the lowest is Kentucky at $47.10/hr.

Bottom 10%
$47.10
Median
$47.10
Average
$47.10
Top 10%
$47.10

Range: $47.10 – $47.10/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2141Painters, Construction and Maintenance.

Davis-Bacon median
$47.10/hr
National median total package (base + fringe)
BLS OEWS market median
$23.40/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+101.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Kentucky KY
Avg base: $31.50/hr
Avg total: $47.10/hr
30 rates

All Rates

30 county-level rates for PAINTERS: BRIDGES WATERBLASTING UNITS WITH 3500 PSI AND ABOVE - $.50 PREMIUM SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND A, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Allen KY highway $31.50 $15.60 $47.10 WD →
Ballard KY highway $31.50 $15.60 $47.10 WD →
Butler KY highway $31.50 $15.60 $47.10 WD →
Caldwell KY highway $31.50 $15.60 $47.10 WD →
Calloway KY highway $31.50 $15.60 $47.10 WD →
Carlisle KY highway $31.50 $15.60 $47.10 WD →
Christian KY highway $31.50 $15.60 $47.10 WD →
Crittenden KY highway $31.50 $15.60 $47.10 WD →
Daviess KY highway $31.50 $15.60 $47.10 WD →
Edmonson KY highway $31.50 $15.60 $47.10 WD →
Fulton KY highway $31.50 $15.60 $47.10 WD →
Graves KY highway $31.50 $15.60 $47.10 WD →
Hancock KY highway $31.50 $15.60 $47.10 WD →
Henderson KY highway $31.50 $15.60 $47.10 WD →
Hickman KY highway $31.50 $15.60 $47.10 WD →
Hopkins KY highway $31.50 $15.60 $47.10 WD →
Livingston KY highway $31.50 $15.60 $47.10 WD →
Logan KY highway $31.50 $15.60 $47.10 WD →
Lyon KY highway $31.50 $15.60 $47.10 WD →
Marshall KY highway $31.50 $15.60 $47.10 WD →
McCracken KY highway $31.50 $15.60 $47.10 WD →
McLean KY highway $31.50 $15.60 $47.10 WD →
Muhlenberg KY highway $31.50 $15.60 $47.10 WD →
Ohio KY highway $31.50 $15.60 $47.10 WD →
Simpson KY highway $31.50 $15.60 $47.10 WD →
Todd KY highway $31.50 $15.60 $47.10 WD →
Trigg KY highway $31.50 $15.60 $47.10 WD →
Union KY highway $31.50 $15.60 $47.10 WD →
Warren KY highway $31.50 $15.60 $47.10 WD →
Webster KY highway $31.50 $15.60 $47.10 WD →
Top-paying counties for PAINTERS: BRIDGES WATERBLASTING UNITS WITH 3500 PSI AND ABOVE - $.50 PREMIUM SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND A →