PAINTER Spray, Structural Steel, & Sandblasting — Prevailing Wage Rates

Davis-Bacon prevailing wages for PAINTER Spray, Structural Steel, & Sandblastings across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 86 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PAINTER Spray, Structural Steel, & Sandblasting is $47.87/hr, with the middle 80% of counties paying between $47.87 and $47.87/hr. The highest state average is Illinois at $47.87/hr; the lowest is Illinois at $47.87/hr.

Bottom 10%
$47.87
Median
$47.87
Average
$47.87
Top 10%
$47.87

Range: $47.87 – $47.87/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2141Painters, Construction and Maintenance.

Davis-Bacon median
$47.87/hr
National median total package (base + fringe)
BLS OEWS market median
$23.40/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+104.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $30.50/hr
Avg total: $47.87/hr
86 rates

All Rates

86 county-level rates for PAINTER Spray, Structural Steel, & Sandblasting, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $30.50 $17.37 $47.87 WD →
Bond IL building $30.50 $17.37 $47.87 WD →
Boone IL building $30.50 $17.37 $47.87 WD →
Brown IL building $30.50 $17.37 $47.87 WD →
Bureau IL heavy $30.50 $17.37 $47.87 WD →
Bureau IL building $30.50 $17.37 $47.87 WD →
Bureau IL highway $30.50 $17.37 $47.87 WD →
Calhoun IL building $30.50 $17.37 $47.87 WD →
Carroll IL building $30.50 $17.37 $47.87 WD →
Carroll IL highway $30.50 $17.37 $47.87 WD →
Carroll IL heavy $30.50 $17.37 $47.87 WD →
Cass IL building $30.50 $17.37 $47.87 WD →
Clinton IL building $30.50 $17.37 $47.87 WD →
De Kalb IL building $30.50 $17.37 $47.87 WD →
Fulton IL heavy $30.50 $17.37 $47.87 WD →
Fulton IL building $30.50 $17.37 $47.87 WD →
Fulton IL highway $30.50 $17.37 $47.87 WD →
Greene IL building $30.50 $17.37 $47.87 WD →
Hancock IL heavy $30.50 $17.37 $47.87 WD →
Hancock IL building $30.50 $17.37 $47.87 WD →
Hancock IL highway $30.50 $17.37 $47.87 WD →
Henderson IL building $30.50 $17.37 $47.87 WD →
Henderson IL heavy $30.50 $17.37 $47.87 WD →
Henderson IL highway $30.50 $17.37 $47.87 WD →
Henry IL heavy $30.50 $17.37 $47.87 WD →
Henry IL building $30.50 $17.37 $47.87 WD →
Henry IL highway $30.50 $17.37 $47.87 WD →
Jersey IL building $30.50 $17.37 $47.87 WD →
Jo Daviess IL building $30.50 $17.37 $47.87 WD →
Jo Daviess IL highway $30.50 $17.37 $47.87 WD →
Jo Daviess IL heavy $30.50 $17.37 $47.87 WD →
Knox IL highway $30.50 $17.37 $47.87 WD →
Knox IL building $30.50 $17.37 $47.87 WD →
Knox IL heavy $30.50 $17.37 $47.87 WD →
La Salle IL building $30.50 $17.37 $47.87 WD →
Lee IL building $30.50 $17.37 $47.87 WD →
Lee IL heavy $30.50 $17.37 $47.87 WD →
Lee IL highway $30.50 $17.37 $47.87 WD →
Livingston IL building $30.50 $17.37 $47.87 WD →
Logan IL building $30.50 $17.37 $47.87 WD →
Macoupin IL building $30.50 $17.37 $47.87 WD →
Marshall IL building $30.50 $17.37 $47.87 WD →
Mason IL building $30.50 $17.37 $47.87 WD →
McDonough IL highway $30.50 $17.37 $47.87 WD →
McDonough IL building $30.50 $17.37 $47.87 WD →
McDonough IL heavy $30.50 $17.37 $47.87 WD →
McLean IL building $30.50 $17.37 $47.87 WD →
Menard IL building $30.50 $17.37 $47.87 WD →
Mercer IL highway $30.50 $17.37 $47.87 WD →
Mercer IL heavy $30.50 $17.37 $47.87 WD →
Mercer IL building $30.50 $17.37 $47.87 WD →
Monroe IL building $30.50 $17.37 $47.87 WD →
Montgomery IL building $30.50 $17.37 $47.87 WD →
Morgan IL building $30.50 $17.37 $47.87 WD →
Ogle IL heavy $30.50 $17.37 $47.87 WD →
Ogle IL building $30.50 $17.37 $47.87 WD →
Ogle IL highway $30.50 $17.37 $47.87 WD →
Peoria IL highway $30.50 $17.37 $47.87 WD →
Peoria IL heavy $30.50 $17.37 $47.87 WD →
Pike IL building $30.50 $17.37 $47.87 WD →
Putnam IL building $30.50 $17.37 $47.87 WD →
Randolph IL building $30.50 $17.37 $47.87 WD →
Rock Island IL highway $30.50 $17.37 $47.87 WD →
Rock Island IL heavy $30.50 $17.37 $47.87 WD →
Rock Island IL building $30.50 $17.37 $47.87 WD →
Schuyler IL building $30.50 $17.37 $47.87 WD →
Scott IL building $30.50 $17.37 $47.87 WD →
Stark IL highway $30.50 $17.37 $47.87 WD →
Stark IL heavy $30.50 $17.37 $47.87 WD →
Stark IL building $30.50 $17.37 $47.87 WD →
Stephenson IL heavy $30.50 $17.37 $47.87 WD →
Stephenson IL highway $30.50 $17.37 $47.87 WD →
Stephenson IL building $30.50 $17.37 $47.87 WD →
Tazewell IL heavy $30.50 $17.37 $47.87 WD →
Tazewell IL highway $30.50 $17.37 $47.87 WD →
Warren IL building $30.50 $17.37 $47.87 WD →
Warren IL heavy $30.50 $17.37 $47.87 WD →
Warren IL highway $30.50 $17.37 $47.87 WD →
Washington IL building $30.50 $17.37 $47.87 WD →
Whiteside IL building $30.50 $17.37 $47.87 WD →
Whiteside IL heavy $30.50 $17.37 $47.87 WD →
Whiteside IL highway $30.50 $17.37 $47.87 WD →
Winnebago IL highway $30.50 $17.37 $47.87 WD →
Winnebago IL heavy $30.50 $17.37 $47.87 WD →
Winnebago IL building $30.50 $17.37 $47.87 WD →
Woodford IL building $30.50 $17.37 $47.87 WD →
Top-paying counties for PAINTER Spray, Structural Steel, & Sandblasting →