PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES — Prevailing Wage Rates

Davis-Bacon prevailing wages for PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURESs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 41 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES is $48.38/hr, with the middle 80% of counties paying between $48.38 and $48.38/hr. The highest state average is Illinois at $48.38/hr; the lowest is Illinois at $48.38/hr.

Bottom 10%
$48.38
Median
$48.38
Average
$48.38
Top 10%
$48.38

Range: $48.38 – $48.38/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2141Painters, Construction and Maintenance.

Davis-Bacon median
$48.38/hr
National median total package (base + fringe)
BLS OEWS market median
$23.40/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+106.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $28.30/hr
Avg total: $48.38/hr
41 rates

All Rates

41 county-level rates for PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alexander IL building $28.30 $20.08 $48.38 WD →
Champaign IL building $28.30 $20.08 $48.38 WD →
Christian IL building $28.30 $20.08 $48.38 WD →
Clark IL building $28.30 $20.08 $48.38 WD →
Clay IL building $28.30 $20.08 $48.38 WD →
Coles IL building $28.30 $20.08 $48.38 WD →
Crawford IL building $28.30 $20.08 $48.38 WD →
Cumberland IL building $28.30 $20.08 $48.38 WD →
De Witt IL building $28.30 $20.08 $48.38 WD →
Douglas IL building $28.30 $20.08 $48.38 WD →
Edgar IL building $28.30 $20.08 $48.38 WD →
Edwards IL building $28.30 $20.08 $48.38 WD →
Effingham IL building $28.30 $20.08 $48.38 WD →
Fayette IL building $28.30 $20.08 $48.38 WD →
Ford IL building $28.30 $20.08 $48.38 WD →
Franklin IL building $28.30 $20.08 $48.38 WD →
Gallatin IL building $28.30 $20.08 $48.38 WD →
Hamilton IL building $28.30 $20.08 $48.38 WD →
Hardin IL building $28.30 $20.08 $48.38 WD →
Iroquois IL building $28.30 $20.08 $48.38 WD →
Jackson IL building $28.30 $20.08 $48.38 WD →
Jasper IL building $28.30 $20.08 $48.38 WD →
Jefferson IL building $28.30 $20.08 $48.38 WD →
Johnson IL building $28.30 $20.08 $48.38 WD →
Lawrence IL building $28.30 $20.08 $48.38 WD →
Marion IL building $28.30 $20.08 $48.38 WD →
Massac IL building $28.30 $20.08 $48.38 WD →
Moultrie IL building $28.30 $20.08 $48.38 WD →
Perry IL building $28.30 $20.08 $48.38 WD →
Piatt IL building $28.30 $20.08 $48.38 WD →
Pope IL building $28.30 $20.08 $48.38 WD →
Pulaski IL building $28.30 $20.08 $48.38 WD →
Richland IL building $28.30 $20.08 $48.38 WD →
Saline IL building $28.30 $20.08 $48.38 WD →
Shelby IL building $28.30 $20.08 $48.38 WD →
Union IL building $28.30 $20.08 $48.38 WD →
Vermilion IL building $28.30 $20.08 $48.38 WD →
Wabash IL building $28.30 $20.08 $48.38 WD →
Wayne IL building $28.30 $20.08 $48.38 WD →
White IL building $28.30 $20.08 $48.38 WD →
Williamson IL building $28.30 $20.08 $48.38 WD →
Top-paying counties for PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES →