PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM — Prevailing Wage Rates

Davis-Bacon prevailing wages for PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUMs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 4 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM is $48.37/hr, with the middle 80% of counties paying between $48.37 and $48.37/hr. The highest state average is Illinois at $48.37/hr; the lowest is Illinois at $48.37/hr.

Bottom 10%
$48.37
Median
$48.37
Average
$48.37
Top 10%
$48.37

Range: $48.37 – $48.37/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2141Painters, Construction and Maintenance.

Davis-Bacon median
$48.37/hr
National median total package (base + fringe)
BLS OEWS market median
$23.40/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+106.7%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $31.25/hr
Avg total: $48.37/hr
4 rates

All Rates

4 county-level rates for PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Madison IL building $31.25 $17.12 $48.37 WD →
Madison IL residential $31.25 $17.12 $48.37 WD →
St Clair IL building $31.25 $17.12 $48.37 WD →
St Clair IL residential $31.25 $17.12 $48.37 WD →
Top-paying counties for PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM →