OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKL — Prevailing Wage Rates

Davis-Bacon prevailing wages for OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKLs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 4 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKL is $94.09/hr, with the middle 80% of counties paying between $94.09 and $94.09/hr. The highest state average is New York at $94.09/hr; the lowest is New York at $94.09/hr.

Bottom 10%
$94.09
Median
$94.09
Average
$94.09
Top 10%
$94.09

Range: $94.09 – $94.09/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

New York NY
Avg base: $56.59/hr
Avg total: $94.09/hr
4 rates

All Rates

4 county-level rates for OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKL, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Rockland NY building $56.59 $37.50 $94.09 WD →
Rockland NY heavy $56.59 $37.50 $94.09 WD →
Rockland NY highway $56.59 $37.50 $94.09 WD →
Rockland NY residential $56.59 $37.50 $94.09 WD →
Top-paying counties for OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS; IMMATERIAL OF POWER; ROAD FINISHING MACHINES; ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT; SPRINKL →