OPERATOR: POWER EQUIPMENT: RIVER Class 2 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT: RIVER Class 2s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 41 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT: RIVER Class 2 is $68.78/hr, with the middle 80% of counties paying between $68.78 and $68.78/hr. The highest state average is Illinois at $68.78/hr; the lowest is Illinois at $68.78/hr.

Bottom 10%
$68.78
Median
$68.78
Average
$68.78
Top 10%
$68.78

Range: $68.78 – $68.78/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $36.78/hr
Avg total: $68.78/hr
41 rates

All Rates

41 county-level rates for OPERATOR: POWER EQUIPMENT: RIVER Class 2, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alexander IL building $36.78 $32.00 $68.78 WD →
Champaign IL building $36.78 $32.00 $68.78 WD →
Christian IL building $36.78 $32.00 $68.78 WD →
Clark IL building $36.78 $32.00 $68.78 WD →
Clay IL building $36.78 $32.00 $68.78 WD →
Coles IL building $36.78 $32.00 $68.78 WD →
Crawford IL building $36.78 $32.00 $68.78 WD →
Cumberland IL building $36.78 $32.00 $68.78 WD →
De Witt IL building $36.78 $32.00 $68.78 WD →
Douglas IL building $36.78 $32.00 $68.78 WD →
Edgar IL building $36.78 $32.00 $68.78 WD →
Edwards IL building $36.78 $32.00 $68.78 WD →
Effingham IL building $36.78 $32.00 $68.78 WD →
Fayette IL building $36.78 $32.00 $68.78 WD →
Ford IL building $36.78 $32.00 $68.78 WD →
Franklin IL building $36.78 $32.00 $68.78 WD →
Gallatin IL building $36.78 $32.00 $68.78 WD →
Hamilton IL building $36.78 $32.00 $68.78 WD →
Hardin IL building $36.78 $32.00 $68.78 WD →
Iroquois IL building $36.78 $32.00 $68.78 WD →
Jackson IL building $36.78 $32.00 $68.78 WD →
Jasper IL building $36.78 $32.00 $68.78 WD →
Jefferson IL building $36.78 $32.00 $68.78 WD →
Johnson IL building $36.78 $32.00 $68.78 WD →
Lawrence IL building $36.78 $32.00 $68.78 WD →
Marion IL building $36.78 $32.00 $68.78 WD →
Massac IL building $36.78 $32.00 $68.78 WD →
Moultrie IL building $36.78 $32.00 $68.78 WD →
Perry IL building $36.78 $32.00 $68.78 WD →
Piatt IL building $36.78 $32.00 $68.78 WD →
Pope IL building $36.78 $32.00 $68.78 WD →
Pulaski IL building $36.78 $32.00 $68.78 WD →
Richland IL building $36.78 $32.00 $68.78 WD →
Saline IL building $36.78 $32.00 $68.78 WD →
Shelby IL building $36.78 $32.00 $68.78 WD →
Union IL building $36.78 $32.00 $68.78 WD →
Vermilion IL building $36.78 $32.00 $68.78 WD →
Wabash IL building $36.78 $32.00 $68.78 WD →
Wayne IL building $36.78 $32.00 $68.78 WD →
White IL building $36.78 $32.00 $68.78 WD →
Williamson IL building $36.78 $32.00 $68.78 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT: RIVER Class 2 →