OPERATOR: POWER EQUIPMENT: RIVER Class 1 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT: RIVER Class 1s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 41 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT: RIVER Class 1 is $72.23/hr, with the middle 80% of counties paying between $72.23 and $72.23/hr. The highest state average is Illinois at $72.23/hr; the lowest is Illinois at $72.23/hr.

Bottom 10%
$72.23
Median
$72.23
Average
$72.23
Top 10%
$72.23

Range: $72.23 – $72.23/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $40.23/hr
Avg total: $72.23/hr
41 rates

All Rates

41 county-level rates for OPERATOR: POWER EQUIPMENT: RIVER Class 1, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alexander IL building $40.23 $32.00 $72.23 WD →
Champaign IL building $40.23 $32.00 $72.23 WD →
Christian IL building $40.23 $32.00 $72.23 WD →
Clark IL building $40.23 $32.00 $72.23 WD →
Clay IL building $40.23 $32.00 $72.23 WD →
Coles IL building $40.23 $32.00 $72.23 WD →
Crawford IL building $40.23 $32.00 $72.23 WD →
Cumberland IL building $40.23 $32.00 $72.23 WD →
De Witt IL building $40.23 $32.00 $72.23 WD →
Douglas IL building $40.23 $32.00 $72.23 WD →
Edgar IL building $40.23 $32.00 $72.23 WD →
Edwards IL building $40.23 $32.00 $72.23 WD →
Effingham IL building $40.23 $32.00 $72.23 WD →
Fayette IL building $40.23 $32.00 $72.23 WD →
Ford IL building $40.23 $32.00 $72.23 WD →
Franklin IL building $40.23 $32.00 $72.23 WD →
Gallatin IL building $40.23 $32.00 $72.23 WD →
Hamilton IL building $40.23 $32.00 $72.23 WD →
Hardin IL building $40.23 $32.00 $72.23 WD →
Iroquois IL building $40.23 $32.00 $72.23 WD →
Jackson IL building $40.23 $32.00 $72.23 WD →
Jasper IL building $40.23 $32.00 $72.23 WD →
Jefferson IL building $40.23 $32.00 $72.23 WD →
Johnson IL building $40.23 $32.00 $72.23 WD →
Lawrence IL building $40.23 $32.00 $72.23 WD →
Marion IL building $40.23 $32.00 $72.23 WD →
Massac IL building $40.23 $32.00 $72.23 WD →
Moultrie IL building $40.23 $32.00 $72.23 WD →
Perry IL building $40.23 $32.00 $72.23 WD →
Piatt IL building $40.23 $32.00 $72.23 WD →
Pope IL building $40.23 $32.00 $72.23 WD →
Pulaski IL building $40.23 $32.00 $72.23 WD →
Richland IL building $40.23 $32.00 $72.23 WD →
Saline IL building $40.23 $32.00 $72.23 WD →
Shelby IL building $40.23 $32.00 $72.23 WD →
Union IL building $40.23 $32.00 $72.23 WD →
Vermilion IL building $40.23 $32.00 $72.23 WD →
Wabash IL building $40.23 $32.00 $72.23 WD →
Wayne IL building $40.23 $32.00 $72.23 WD →
White IL building $40.23 $32.00 $72.23 WD →
Williamson IL building $40.23 $32.00 $72.23 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT: RIVER Class 1 →