OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATERs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 87 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER is $79.05/hr, with the middle 80% of counties paying between $79.05 and $79.05/hr. The highest state average is Illinois at $79.05/hr; the lowest is Illinois at $79.05/hr.

Bottom 10%
$79.05
Median
$79.05
Average
$79.05
Top 10%
$79.05

Range: $79.05 – $79.05/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $37.80/hr
Avg total: $79.05/hr
87 rates

All Rates

87 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $37.80 $41.25 $79.05 WD →
Bond IL building $37.80 $41.25 $79.05 WD →
Boone IL building $37.80 $41.25 $79.05 WD →
Brown IL building $37.80 $41.25 $79.05 WD →
Bureau IL heavy $37.80 $41.25 $79.05 WD →
Bureau IL building $37.80 $41.25 $79.05 WD →
Bureau IL highway $37.80 $41.25 $79.05 WD →
Calhoun IL building $37.80 $41.25 $79.05 WD →
Carroll IL heavy $37.80 $41.25 $79.05 WD →
Carroll IL building $37.80 $41.25 $79.05 WD →
Carroll IL highway $37.80 $41.25 $79.05 WD →
Cass IL building $37.80 $41.25 $79.05 WD →
Clinton IL building $37.80 $41.25 $79.05 WD →
De Kalb IL building $37.80 $41.25 $79.05 WD →
Fulton IL building $37.80 $41.25 $79.05 WD →
Fulton IL heavy $37.80 $41.25 $79.05 WD →
Fulton IL highway $37.80 $41.25 $79.05 WD →
Greene IL building $37.80 $41.25 $79.05 WD →
Hancock IL highway $37.80 $41.25 $79.05 WD →
Hancock IL building $37.80 $41.25 $79.05 WD →
Hancock IL heavy $37.80 $41.25 $79.05 WD →
Henderson IL highway $37.80 $41.25 $79.05 WD →
Henderson IL heavy $37.80 $41.25 $79.05 WD →
Henderson IL building $37.80 $41.25 $79.05 WD →
Henry IL highway $37.80 $41.25 $79.05 WD →
Henry IL building $37.80 $41.25 $79.05 WD →
Henry IL heavy $37.80 $41.25 $79.05 WD →
Henry IL residential $37.80 $41.25 $79.05 WD →
Jersey IL building $37.80 $41.25 $79.05 WD →
Jo Daviess IL heavy $37.80 $41.25 $79.05 WD →
Jo Daviess IL highway $37.80 $41.25 $79.05 WD →
Jo Daviess IL building $37.80 $41.25 $79.05 WD →
Knox IL highway $37.80 $41.25 $79.05 WD →
Knox IL heavy $37.80 $41.25 $79.05 WD →
Knox IL building $37.80 $41.25 $79.05 WD →
La Salle IL building $37.80 $41.25 $79.05 WD →
Lee IL building $37.80 $41.25 $79.05 WD →
Lee IL heavy $37.80 $41.25 $79.05 WD →
Lee IL highway $37.80 $41.25 $79.05 WD →
Livingston IL building $37.80 $41.25 $79.05 WD →
Logan IL building $37.80 $41.25 $79.05 WD →
Macoupin IL building $37.80 $41.25 $79.05 WD →
Marshall IL building $37.80 $41.25 $79.05 WD →
Mason IL building $37.80 $41.25 $79.05 WD →
McDonough IL heavy $37.80 $41.25 $79.05 WD →
McDonough IL building $37.80 $41.25 $79.05 WD →
McDonough IL highway $37.80 $41.25 $79.05 WD →
McLean IL building $37.80 $41.25 $79.05 WD →
Menard IL building $37.80 $41.25 $79.05 WD →
Mercer IL building $37.80 $41.25 $79.05 WD →
Mercer IL highway $37.80 $41.25 $79.05 WD →
Mercer IL heavy $37.80 $41.25 $79.05 WD →
Monroe IL building $37.80 $41.25 $79.05 WD →
Montgomery IL building $37.80 $41.25 $79.05 WD →
Morgan IL building $37.80 $41.25 $79.05 WD →
Ogle IL highway $37.80 $41.25 $79.05 WD →
Ogle IL heavy $37.80 $41.25 $79.05 WD →
Ogle IL building $37.80 $41.25 $79.05 WD →
Peoria IL heavy $37.80 $41.25 $79.05 WD →
Peoria IL highway $37.80 $41.25 $79.05 WD →
Pike IL building $37.80 $41.25 $79.05 WD →
Putnam IL building $37.80 $41.25 $79.05 WD →
Randolph IL building $37.80 $41.25 $79.05 WD →
Rock Island IL building $37.80 $41.25 $79.05 WD →
Rock Island IL highway $37.80 $41.25 $79.05 WD →
Rock Island IL heavy $37.80 $41.25 $79.05 WD →
Schuyler IL building $37.80 $41.25 $79.05 WD →
Scott IL building $37.80 $41.25 $79.05 WD →
Stark IL building $37.80 $41.25 $79.05 WD →
Stark IL heavy $37.80 $41.25 $79.05 WD →
Stark IL highway $37.80 $41.25 $79.05 WD →
Stephenson IL heavy $37.80 $41.25 $79.05 WD →
Stephenson IL building $37.80 $41.25 $79.05 WD →
Stephenson IL highway $37.80 $41.25 $79.05 WD →
Tazewell IL heavy $37.80 $41.25 $79.05 WD →
Tazewell IL highway $37.80 $41.25 $79.05 WD →
Warren IL building $37.80 $41.25 $79.05 WD →
Warren IL highway $37.80 $41.25 $79.05 WD →
Warren IL heavy $37.80 $41.25 $79.05 WD →
Washington IL building $37.80 $41.25 $79.05 WD →
Whiteside IL heavy $37.80 $41.25 $79.05 WD →
Whiteside IL building $37.80 $41.25 $79.05 WD →
Whiteside IL highway $37.80 $41.25 $79.05 WD →
Winnebago IL highway $37.80 $41.25 $79.05 WD →
Winnebago IL heavy $37.80 $41.25 $79.05 WD →
Winnebago IL building $37.80 $41.25 $79.05 WD →
Woodford IL building $37.80 $41.25 $79.05 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATER →