OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER H — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER Hs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 14 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER H is $48.36/hr, with the middle 80% of counties paying between $48.36 and $48.36/hr. The highest state average is Michigan at $48.36/hr; the lowest is Michigan at $48.36/hr.

Bottom 10%
$48.36
Median
$48.36
Average
$48.36
Top 10%
$48.36

Range: $48.36 – $48.36/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Michigan MI
Avg base: $35.86/hr
Avg total: $48.36/hr
14 rates

All Rates

14 county-level rates for OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER H, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alger MI heavy $35.86 $12.50 $48.36 WD →
Baraga MI heavy $35.86 $12.50 $48.36 WD →
Chippewa MI heavy $35.86 $12.50 $48.36 WD →
Delta MI heavy $35.86 $12.50 $48.36 WD →
Dickinson MI heavy $35.86 $12.50 $48.36 WD →
Houghton MI heavy $35.86 $12.50 $48.36 WD →
Iron MI heavy $35.86 $12.50 $48.36 WD →
Keweenaw MI heavy $35.86 $12.50 $48.36 WD →
Luce MI heavy $35.86 $12.50 $48.36 WD →
Mackinac MI heavy $35.86 $12.50 $48.36 WD →
Marquette MI heavy $35.86 $12.50 $48.36 WD →
Menominee MI heavy $35.86 $12.50 $48.36 WD →
Ontonagon MI heavy $35.86 $12.50 $48.36 WD →
Schoolcraft MI heavy $35.86 $12.50 $48.36 WD →
Top-paying counties for OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER H →