OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 87 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE is $80.10/hr, with the middle 80% of counties paying between $80.10 and $84.75/hr. The highest state average is Illinois at $81.17/hr; the lowest is Illinois at $81.17/hr.

Bottom 10%
$80.10
Median
$80.10
Average
$81.17
Top 10%
$84.75

Range: $80.10 – $84.75/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $39.92/hr
Avg total: $81.17/hr
87 rates

All Rates

87 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $38.85 $41.25 $80.10 WD →
Bond IL building $38.85 $41.25 $80.10 WD →
Boone IL building $38.85 $41.25 $80.10 WD →
Brown IL building $38.85 $41.25 $80.10 WD →
Bureau IL heavy $43.50 $41.25 $84.75 WD →
Bureau IL building $38.85 $41.25 $80.10 WD →
Bureau IL highway $43.50 $41.25 $84.75 WD →
Calhoun IL building $38.85 $41.25 $80.10 WD →
Carroll IL heavy $43.50 $41.25 $84.75 WD →
Carroll IL building $38.85 $41.25 $80.10 WD →
Carroll IL highway $43.50 $41.25 $84.75 WD →
Cass IL building $38.85 $41.25 $80.10 WD →
Clinton IL building $38.85 $41.25 $80.10 WD →
De Kalb IL building $38.85 $41.25 $80.10 WD →
Fulton IL building $38.85 $41.25 $80.10 WD →
Fulton IL heavy $38.85 $41.25 $80.10 WD →
Fulton IL highway $38.85 $41.25 $80.10 WD →
Greene IL building $38.85 $41.25 $80.10 WD →
Hancock IL highway $38.85 $41.25 $80.10 WD →
Hancock IL building $38.85 $41.25 $80.10 WD →
Hancock IL heavy $38.85 $41.25 $80.10 WD →
Henderson IL highway $38.85 $41.25 $80.10 WD →
Henderson IL heavy $38.85 $41.25 $80.10 WD →
Henderson IL building $38.85 $41.25 $80.10 WD →
Henry IL highway $43.50 $41.25 $84.75 WD →
Henry IL building $38.85 $41.25 $80.10 WD →
Henry IL heavy $43.50 $41.25 $84.75 WD →
Henry IL residential $38.85 $41.25 $80.10 WD →
Jersey IL building $38.85 $41.25 $80.10 WD →
Jo Daviess IL heavy $43.50 $41.25 $84.75 WD →
Jo Daviess IL highway $43.50 $41.25 $84.75 WD →
Jo Daviess IL building $38.85 $41.25 $80.10 WD →
Knox IL highway $38.85 $41.25 $80.10 WD →
Knox IL heavy $38.85 $41.25 $80.10 WD →
Knox IL building $38.85 $41.25 $80.10 WD →
La Salle IL building $38.85 $41.25 $80.10 WD →
Lee IL building $38.85 $41.25 $80.10 WD →
Lee IL heavy $43.50 $41.25 $84.75 WD →
Lee IL highway $43.50 $41.25 $84.75 WD →
Livingston IL building $38.85 $41.25 $80.10 WD →
Logan IL building $38.85 $41.25 $80.10 WD →
Macoupin IL building $38.85 $41.25 $80.10 WD →
Marshall IL building $38.85 $41.25 $80.10 WD →
Mason IL building $38.85 $41.25 $80.10 WD →
McDonough IL heavy $38.85 $41.25 $80.10 WD →
McDonough IL building $38.85 $41.25 $80.10 WD →
McDonough IL highway $38.85 $41.25 $80.10 WD →
McLean IL building $38.85 $41.25 $80.10 WD →
Menard IL building $38.85 $41.25 $80.10 WD →
Mercer IL building $38.85 $41.25 $80.10 WD →
Mercer IL highway $38.85 $41.25 $80.10 WD →
Mercer IL heavy $38.85 $41.25 $80.10 WD →
Monroe IL building $38.85 $41.25 $80.10 WD →
Montgomery IL building $38.85 $41.25 $80.10 WD →
Morgan IL building $38.85 $41.25 $80.10 WD →
Ogle IL highway $43.50 $41.25 $84.75 WD →
Ogle IL heavy $43.50 $41.25 $84.75 WD →
Ogle IL building $38.85 $41.25 $80.10 WD →
Peoria IL heavy $38.85 $41.25 $80.10 WD →
Peoria IL highway $38.85 $41.25 $80.10 WD →
Pike IL building $38.85 $41.25 $80.10 WD →
Putnam IL building $38.85 $41.25 $80.10 WD →
Randolph IL building $38.85 $41.25 $80.10 WD →
Rock Island IL building $38.85 $41.25 $80.10 WD →
Rock Island IL highway $43.50 $41.25 $84.75 WD →
Rock Island IL heavy $43.50 $41.25 $84.75 WD →
Schuyler IL building $38.85 $41.25 $80.10 WD →
Scott IL building $38.85 $41.25 $80.10 WD →
Stark IL building $38.85 $41.25 $80.10 WD →
Stark IL heavy $38.85 $41.25 $80.10 WD →
Stark IL highway $38.85 $41.25 $80.10 WD →
Stephenson IL heavy $43.50 $41.25 $84.75 WD →
Stephenson IL building $38.85 $41.25 $80.10 WD →
Stephenson IL highway $43.50 $41.25 $84.75 WD →
Tazewell IL heavy $38.85 $41.25 $80.10 WD →
Tazewell IL highway $38.85 $41.25 $80.10 WD →
Warren IL building $38.85 $41.25 $80.10 WD →
Warren IL highway $38.85 $41.25 $80.10 WD →
Warren IL heavy $38.85 $41.25 $80.10 WD →
Washington IL building $38.85 $41.25 $80.10 WD →
Whiteside IL heavy $43.50 $41.25 $84.75 WD →
Whiteside IL building $38.85 $41.25 $80.10 WD →
Whiteside IL highway $43.50 $41.25 $84.75 WD →
Winnebago IL highway $43.50 $41.25 $84.75 WD →
Winnebago IL heavy $43.50 $41.25 $84.75 WD →
Winnebago IL building $38.85 $41.25 $80.10 WD →
Woodford IL building $38.85 $41.25 $80.10 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE →