OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANEs across all covered states and counties. Rates vary by location and construction type.
Across 87 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE is $80.10/hr, with the middle 80% of counties paying between $80.10 and $84.75/hr. The highest state average is Illinois at $81.17/hr; the lowest is Illinois at $81.17/hr.
Range: $80.10 – $84.75/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
87 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adams | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Bond | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Boone | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Brown | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Bureau | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Bureau | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Bureau | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Calhoun | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Carroll | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Carroll | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Carroll | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Cass | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Clinton | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| De Kalb | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Fulton | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Fulton | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Fulton | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Greene | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Hancock | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Hancock | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Hancock | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Henderson | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Henderson | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Henderson | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Henry | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Henry | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Henry | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Henry | IL | residential | $38.85 | $41.25 | $80.10 | WD → |
| Jersey | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Jo Daviess | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Jo Daviess | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Jo Daviess | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Knox | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Knox | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Knox | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| La Salle | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Lee | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Lee | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Lee | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Livingston | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Logan | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Macoupin | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Marshall | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Mason | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| McDonough | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| McDonough | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| McDonough | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| McLean | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Menard | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Mercer | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Mercer | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Mercer | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Monroe | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Montgomery | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Morgan | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Ogle | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Ogle | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Ogle | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Peoria | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Peoria | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Pike | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Putnam | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Randolph | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Rock Island | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Rock Island | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Rock Island | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Schuyler | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Scott | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Stark | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Stark | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Stark | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Stephenson | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Stephenson | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Stephenson | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Tazewell | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Tazewell | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Warren | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Warren | IL | highway | $38.85 | $41.25 | $80.10 | WD → |
| Warren | IL | heavy | $38.85 | $41.25 | $80.10 | WD → |
| Washington | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Whiteside | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Whiteside | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Whiteside | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Winnebago | IL | highway | $43.50 | $41.25 | $84.75 | WD → |
| Winnebago | IL | heavy | $43.50 | $41.25 | $84.75 | WD → |
| Winnebago | IL | building | $38.85 | $41.25 | $80.10 | WD → |
| Woodford | IL | building | $38.85 | $41.25 | $80.10 | WD → |