OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILL — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 67 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILL is $82.75/hr, with the middle 80% of counties paying between $82.75 and $82.75/hr. The highest state average is Illinois at $82.75/hr; the lowest is Illinois at $82.75/hr.

Bottom 10%
$82.75
Median
$82.75
Average
$82.75
Top 10%
$82.75

Range: $82.75 – $82.75/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $41.50/hr
Avg total: $82.75/hr
67 rates

All Rates

67 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILL, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $41.50 $41.25 $82.75 WD →
Bond IL building $41.50 $41.25 $82.75 WD →
Boone IL building $41.50 $41.25 $82.75 WD →
Brown IL building $41.50 $41.25 $82.75 WD →
Bureau IL building $41.50 $41.25 $82.75 WD →
Calhoun IL building $41.50 $41.25 $82.75 WD →
Carroll IL building $41.50 $41.25 $82.75 WD →
Cass IL building $41.50 $41.25 $82.75 WD →
Clinton IL building $41.50 $41.25 $82.75 WD →
De Kalb IL building $41.50 $41.25 $82.75 WD →
Fulton IL building $41.50 $41.25 $82.75 WD →
Fulton IL highway $41.50 $41.25 $82.75 WD →
Fulton IL heavy $41.50 $41.25 $82.75 WD →
Greene IL building $41.50 $41.25 $82.75 WD →
Hancock IL heavy $41.50 $41.25 $82.75 WD →
Hancock IL highway $41.50 $41.25 $82.75 WD →
Hancock IL building $41.50 $41.25 $82.75 WD →
Henderson IL building $41.50 $41.25 $82.75 WD →
Henderson IL heavy $41.50 $41.25 $82.75 WD →
Henderson IL highway $41.50 $41.25 $82.75 WD →
Henry IL residential $41.50 $41.25 $82.75 WD →
Henry IL building $41.50 $41.25 $82.75 WD →
Jersey IL building $41.50 $41.25 $82.75 WD →
Jo Daviess IL building $41.50 $41.25 $82.75 WD →
Knox IL highway $41.50 $41.25 $82.75 WD →
Knox IL building $41.50 $41.25 $82.75 WD →
Knox IL heavy $41.50 $41.25 $82.75 WD →
La Salle IL building $41.50 $41.25 $82.75 WD →
Lee IL building $41.50 $41.25 $82.75 WD →
Livingston IL building $41.50 $41.25 $82.75 WD →
Logan IL building $41.50 $41.25 $82.75 WD →
Macoupin IL building $41.50 $41.25 $82.75 WD →
Marshall IL building $41.50 $41.25 $82.75 WD →
Mason IL building $41.50 $41.25 $82.75 WD →
McDonough IL heavy $41.50 $41.25 $82.75 WD →
McDonough IL building $41.50 $41.25 $82.75 WD →
McDonough IL highway $41.50 $41.25 $82.75 WD →
McLean IL building $41.50 $41.25 $82.75 WD →
Menard IL building $41.50 $41.25 $82.75 WD →
Mercer IL building $41.50 $41.25 $82.75 WD →
Mercer IL heavy $41.50 $41.25 $82.75 WD →
Mercer IL highway $41.50 $41.25 $82.75 WD →
Monroe IL building $41.50 $41.25 $82.75 WD →
Montgomery IL building $41.50 $41.25 $82.75 WD →
Morgan IL building $41.50 $41.25 $82.75 WD →
Ogle IL building $41.50 $41.25 $82.75 WD →
Peoria IL heavy $41.50 $41.25 $82.75 WD →
Peoria IL highway $41.50 $41.25 $82.75 WD →
Pike IL building $41.50 $41.25 $82.75 WD →
Putnam IL building $41.50 $41.25 $82.75 WD →
Randolph IL building $41.50 $41.25 $82.75 WD →
Rock Island IL building $41.50 $41.25 $82.75 WD →
Schuyler IL building $41.50 $41.25 $82.75 WD →
Scott IL building $41.50 $41.25 $82.75 WD →
Stark IL building $41.50 $41.25 $82.75 WD →
Stark IL heavy $41.50 $41.25 $82.75 WD →
Stark IL highway $41.50 $41.25 $82.75 WD →
Stephenson IL building $41.50 $41.25 $82.75 WD →
Tazewell IL heavy $41.50 $41.25 $82.75 WD →
Tazewell IL highway $41.50 $41.25 $82.75 WD →
Warren IL building $41.50 $41.25 $82.75 WD →
Warren IL heavy $41.50 $41.25 $82.75 WD →
Warren IL highway $41.50 $41.25 $82.75 WD →
Washington IL building $41.50 $41.25 $82.75 WD →
Whiteside IL building $41.50 $41.25 $82.75 WD →
Winnebago IL building $41.50 $41.25 $82.75 WD →
Woodford IL building $41.50 $41.25 $82.75 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILL →