Quick Answer

Across 47 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI is $91.21/hr, with the middle 80% of counties paying between $91.21 and $91.21/hr. The highest state average is Illinois at $91.21/hr; the lowest is Illinois at $91.21/hr.

Bottom 10%
$91.21
Median
$91.21
Average
$91.21
Top 10%
$91.21

Range: $91.21 – $91.21/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $47.79/hr
Avg total: $91.21/hr
47 rates

All Rates

47 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $47.79 $43.42 $91.21 WD →
Bond IL building $47.79 $43.42 $91.21 WD →
Boone IL building $47.79 $43.42 $91.21 WD →
Brown IL building $47.79 $43.42 $91.21 WD →
Bureau IL building $47.79 $43.42 $91.21 WD →
Calhoun IL building $47.79 $43.42 $91.21 WD →
Carroll IL building $47.79 $43.42 $91.21 WD →
Cass IL building $47.79 $43.42 $91.21 WD →
Clinton IL building $47.79 $43.42 $91.21 WD →
De Kalb IL building $47.79 $43.42 $91.21 WD →
Fulton IL building $47.79 $43.42 $91.21 WD →
Greene IL building $47.79 $43.42 $91.21 WD →
Hancock IL building $47.79 $43.42 $91.21 WD →
Henderson IL building $47.79 $43.42 $91.21 WD →
Henry IL building $47.79 $43.42 $91.21 WD →
Henry IL residential $47.79 $43.42 $91.21 WD →
Jersey IL building $47.79 $43.42 $91.21 WD →
Jo Daviess IL building $47.79 $43.42 $91.21 WD →
Knox IL building $47.79 $43.42 $91.21 WD →
La Salle IL building $47.79 $43.42 $91.21 WD →
Lee IL building $47.79 $43.42 $91.21 WD →
Livingston IL building $47.79 $43.42 $91.21 WD →
Logan IL building $47.79 $43.42 $91.21 WD →
Macoupin IL building $47.79 $43.42 $91.21 WD →
Marshall IL building $47.79 $43.42 $91.21 WD →
Mason IL building $47.79 $43.42 $91.21 WD →
McDonough IL building $47.79 $43.42 $91.21 WD →
McLean IL building $47.79 $43.42 $91.21 WD →
Menard IL building $47.79 $43.42 $91.21 WD →
Mercer IL building $47.79 $43.42 $91.21 WD →
Monroe IL building $47.79 $43.42 $91.21 WD →
Montgomery IL building $47.79 $43.42 $91.21 WD →
Morgan IL building $47.79 $43.42 $91.21 WD →
Ogle IL building $47.79 $43.42 $91.21 WD →
Pike IL building $47.79 $43.42 $91.21 WD →
Putnam IL building $47.79 $43.42 $91.21 WD →
Randolph IL building $47.79 $43.42 $91.21 WD →
Rock Island IL building $47.79 $43.42 $91.21 WD →
Schuyler IL building $47.79 $43.42 $91.21 WD →
Scott IL building $47.79 $43.42 $91.21 WD →
Stark IL building $47.79 $43.42 $91.21 WD →
Stephenson IL building $47.79 $43.42 $91.21 WD →
Warren IL building $47.79 $43.42 $91.21 WD →
Washington IL building $47.79 $43.42 $91.21 WD →
Whiteside IL building $47.79 $43.42 $91.21 WD →
Winnebago IL building $47.79 $43.42 $91.21 WD →
Woodford IL building $47.79 $43.42 $91.21 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OI →