OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES)s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 46 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) is $84.75/hr, with the middle 80% of counties paying between $84.75 and $84.75/hr. The highest state average is Illinois at $84.75/hr; the lowest is Illinois at $84.75/hr.

Bottom 10%
$84.75
Median
$84.75
Average
$84.75
Top 10%
$84.75

Range: $84.75 – $84.75/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $43.50/hr
Avg total: $84.75/hr
46 rates

All Rates

46 county-level rates for OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES), ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $43.50 $41.25 $84.75 WD →
Bond IL building $43.50 $41.25 $84.75 WD →
Boone IL building $43.50 $41.25 $84.75 WD →
Brown IL building $43.50 $41.25 $84.75 WD →
Bureau IL building $43.50 $41.25 $84.75 WD →
Calhoun IL building $43.50 $41.25 $84.75 WD →
Carroll IL building $43.50 $41.25 $84.75 WD →
Cass IL building $43.50 $41.25 $84.75 WD →
Clinton IL building $43.50 $41.25 $84.75 WD →
De Kalb IL building $43.50 $41.25 $84.75 WD →
Fulton IL building $43.50 $41.25 $84.75 WD →
Greene IL building $43.50 $41.25 $84.75 WD →
Hancock IL building $43.50 $41.25 $84.75 WD →
Henderson IL building $43.50 $41.25 $84.75 WD →
Henry IL building $43.50 $41.25 $84.75 WD →
Jersey IL building $43.50 $41.25 $84.75 WD →
Jo Daviess IL building $43.50 $41.25 $84.75 WD →
Knox IL building $43.50 $41.25 $84.75 WD →
La Salle IL building $43.50 $41.25 $84.75 WD →
Lee IL building $43.50 $41.25 $84.75 WD →
Livingston IL building $43.50 $41.25 $84.75 WD →
Logan IL building $43.50 $41.25 $84.75 WD →
Macoupin IL building $43.50 $41.25 $84.75 WD →
Marshall IL building $43.50 $41.25 $84.75 WD →
Mason IL building $43.50 $41.25 $84.75 WD →
McDonough IL building $43.50 $41.25 $84.75 WD →
McLean IL building $43.50 $41.25 $84.75 WD →
Menard IL building $43.50 $41.25 $84.75 WD →
Mercer IL building $43.50 $41.25 $84.75 WD →
Monroe IL building $43.50 $41.25 $84.75 WD →
Montgomery IL building $43.50 $41.25 $84.75 WD →
Morgan IL building $43.50 $41.25 $84.75 WD →
Ogle IL building $43.50 $41.25 $84.75 WD →
Pike IL building $43.50 $41.25 $84.75 WD →
Putnam IL building $43.50 $41.25 $84.75 WD →
Randolph IL building $43.50 $41.25 $84.75 WD →
Rock Island IL building $43.50 $41.25 $84.75 WD →
Schuyler IL building $43.50 $41.25 $84.75 WD →
Scott IL building $43.50 $41.25 $84.75 WD →
Stark IL building $43.50 $41.25 $84.75 WD →
Stephenson IL building $43.50 $41.25 $84.75 WD →
Warren IL building $43.50 $41.25 $84.75 WD →
Washington IL building $43.50 $41.25 $84.75 WD →
Whiteside IL building $43.50 $41.25 $84.75 WD →
Winnebago IL building $43.50 $41.25 $84.75 WD →
Woodford IL building $43.50 $41.25 $84.75 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE; TOW OR PUSH BOAT (HENRY, MERCER, ROCK ISLAND, AND WHITESIDE COUNTIES) →