OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EP — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 52 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EP is $69.49/hr, with the middle 80% of counties paying between $69.49 and $69.49/hr. The highest state average is Wisconsin at $69.49/hr; the lowest is Wisconsin at $69.49/hr.

Bottom 10%
$69.49
Median
$69.49
Average
$69.49
Top 10%
$69.49

Range: $69.49 – $69.49/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Wisconsin WI
Avg base: $41.60/hr
Avg total: $69.49/hr
52 rates

All Rates

52 county-level rates for OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EP, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams WI building $41.60 $27.89 $69.49 WD →
Ashland WI building $41.60 $27.89 $69.49 WD →
Barron WI building $41.60 $27.89 $69.49 WD →
Bayfield WI building $41.60 $27.89 $69.49 WD →
Buffalo WI building $41.60 $27.89 $69.49 WD →
Burnett WI building $41.60 $27.89 $69.49 WD →
Clark WI building $41.60 $27.89 $69.49 WD →
Columbia WI building $41.60 $27.89 $69.49 WD →
Crawford WI building $41.60 $27.89 $69.49 WD →
Dodge WI building $41.60 $27.89 $69.49 WD →
Door WI building $41.60 $27.89 $69.49 WD →
Dunn WI building $41.60 $27.89 $69.49 WD →
Florence WI building $41.60 $27.89 $69.49 WD →
Fond Du Lac WI building $41.60 $27.89 $69.49 WD →
Forest WI building $41.60 $27.89 $69.49 WD →
Grant WI building $41.60 $27.89 $69.49 WD →
Green WI building $41.60 $27.89 $69.49 WD →
Green Lake WI building $41.60 $27.89 $69.49 WD →
Iowa WI building $41.60 $27.89 $69.49 WD →
Iron WI building $41.60 $27.89 $69.49 WD →
Jackson WI building $41.60 $27.89 $69.49 WD →
Jefferson WI building $41.60 $27.89 $69.49 WD →
Juneau WI building $41.60 $27.89 $69.49 WD →
Kewaunee WI building $41.60 $27.89 $69.49 WD →
Lafayette WI building $41.60 $27.89 $69.49 WD →
Langlade WI building $41.60 $27.89 $69.49 WD →
Lincoln WI building $41.60 $27.89 $69.49 WD →
Manitowoc WI building $41.60 $27.89 $69.49 WD →
Marinette WI building $41.60 $27.89 $69.49 WD →
Marquette WI building $41.60 $27.89 $69.49 WD →
Menominee WI building $41.60 $27.89 $69.49 WD →
Monroe WI building $41.60 $27.89 $69.49 WD →
Oconto WI building $41.60 $27.89 $69.49 WD →
Oneida WI building $41.60 $27.89 $69.49 WD →
Pepin WI building $41.60 $27.89 $69.49 WD →
Polk WI building $41.60 $27.89 $69.49 WD →
Portage WI building $41.60 $27.89 $69.49 WD →
Price WI building $41.60 $27.89 $69.49 WD →
Richland WI building $41.60 $27.89 $69.49 WD →
Rusk WI building $41.60 $27.89 $69.49 WD →
Sauk WI building $41.60 $27.89 $69.49 WD →
Sawyer WI building $41.60 $27.89 $69.49 WD →
Shawano WI building $41.60 $27.89 $69.49 WD →
Taylor WI building $41.60 $27.89 $69.49 WD →
Trempealeau WI building $41.60 $27.89 $69.49 WD →
Vernon WI building $41.60 $27.89 $69.49 WD →
Vilas WI building $41.60 $27.89 $69.49 WD →
Walworth WI building $41.60 $27.89 $69.49 WD →
Washburn WI building $41.60 $27.89 $69.49 WD →
Waupaca WI building $41.60 $27.89 $69.49 WD →
Waushara WI building $41.60 $27.89 $69.49 WD →
Wood WI building $41.60 $27.89 $69.49 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EP →