MECHANICAL, HEAT AND FROST INSULATION — Prevailing Wage Rates

Davis-Bacon prevailing wages for MECHANICAL, HEAT AND FROST INSULATIONs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 23 Davis-Bacon rate records nationwide, the median total package (base + fringe) for MECHANICAL, HEAT AND FROST INSULATION is $28.13/hr, with the middle 80% of counties paying between $28.13 and $28.13/hr. The highest state average is Wyoming at $28.13/hr; the lowest is Wyoming at $28.13/hr.

Bottom 10%
$28.13
Median
$28.13
Average
$28.13
Top 10%
$28.13

Range: $28.13 – $28.13/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Wyoming WY
Avg base: $25.50/hr
Avg total: $28.13/hr
23 rates

All Rates

23 county-level rates for MECHANICAL, HEAT AND FROST INSULATION, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Albany WY building $25.50 $2.63 $28.13 WD →
Big Horn WY building $25.50 $2.63 $28.13 WD →
Campbell WY building $25.50 $2.63 $28.13 WD →
Carbon WY building $25.50 $2.63 $28.13 WD →
Converse WY building $25.50 $2.63 $28.13 WD →
Crook WY building $25.50 $2.63 $28.13 WD →
Fremont WY building $25.50 $2.63 $28.13 WD →
Goshen WY building $25.50 $2.63 $28.13 WD →
Hot Springs WY building $25.50 $2.63 $28.13 WD →
Johnson WY building $25.50 $2.63 $28.13 WD →
Laramie WY building $25.50 $2.63 $28.13 WD →
Lincoln WY building $25.50 $2.63 $28.13 WD →
Natrona WY building $25.50 $2.63 $28.13 WD →
Niobrara WY building $25.50 $2.63 $28.13 WD →
Park WY building $25.50 $2.63 $28.13 WD →
Platte WY building $25.50 $2.63 $28.13 WD →
Sheridan WY building $25.50 $2.63 $28.13 WD →
Sublette WY building $25.50 $2.63 $28.13 WD →
Sweetwater WY building $25.50 $2.63 $28.13 WD →
Teton WY building $25.50 $2.63 $28.13 WD →
Uinta WY building $25.50 $2.63 $28.13 WD →
Washakie WY building $25.50 $2.63 $28.13 WD →
Weston WY building $25.50 $2.63 $28.13 WD →
Top-paying counties for MECHANICAL, HEAT AND FROST INSULATION →