LINE CONSTRUCTION: LINE TECHNICIAN — Prevailing Wage Rates

Davis-Bacon prevailing wages for LINE CONSTRUCTION: LINE TECHNICIANs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 25 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION: LINE TECHNICIAN is $10.08/hr, with the middle 80% of counties paying between $10.08 and $10.08/hr. The highest state average is South Carolina at $10.08/hr; the lowest is South Carolina at $10.08/hr.

Bottom 10%
$10.08
Median
$10.08
Average
$10.08
Top 10%
$10.08

Range: $10.08 – $10.08/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051Electrical Power-Line Installers and Repairers.

Davis-Bacon median
$10.08/hr
National median total package (base + fringe)
BLS OEWS market median
$44.50/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-77.3%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

South Carolina SC
Avg base: $10.08/hr
Avg total: $10.08/hr
25 rates

All Rates

25 county-level rates for LINE CONSTRUCTION: LINE TECHNICIAN, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Abbeville SC heavy $10.08 $0.00 $10.08 WD →
Allendale SC heavy $10.08 $0.00 $10.08 WD →
Bamberg SC heavy $10.08 $0.00 $10.08 WD →
Barnwell SC heavy $10.08 $0.00 $10.08 WD →
Beaufort SC heavy $10.08 $0.00 $10.08 WD →
Cherokee SC heavy $10.08 $0.00 $10.08 WD →
Chester SC heavy $10.08 $0.00 $10.08 WD →
Chesterfield SC heavy $10.08 $0.00 $10.08 WD →
Clarendon SC heavy $10.08 $0.00 $10.08 WD →
Colleton SC heavy $10.08 $0.00 $10.08 WD →
Dillon SC heavy $10.08 $0.00 $10.08 WD →
Georgetown SC heavy $10.08 $0.00 $10.08 WD →
Greenwood SC heavy $10.08 $0.00 $10.08 WD →
Hampton SC heavy $10.08 $0.00 $10.08 WD →
Jasper SC heavy $10.08 $0.00 $10.08 WD →
Lancaster SC heavy $10.08 $0.00 $10.08 WD →
Lee SC heavy $10.08 $0.00 $10.08 WD →
Marion SC heavy $10.08 $0.00 $10.08 WD →
Marlboro SC heavy $10.08 $0.00 $10.08 WD →
McCormick SC heavy $10.08 $0.00 $10.08 WD →
Newberry SC heavy $10.08 $0.00 $10.08 WD →
Oconee SC heavy $10.08 $0.00 $10.08 WD →
Orangeburg SC heavy $10.08 $0.00 $10.08 WD →
Union SC heavy $10.08 $0.00 $10.08 WD →
Williamsburg SC heavy $10.08 $0.00 $10.08 WD →
Top-paying counties for LINE CONSTRUCTION: LINE TECHNICIAN →