LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00 — Prevailing Wage Rates
Davis-Bacon prevailing wages for LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00s across all covered states and counties. Rates vary by location and construction type.
Across 10 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00 is $93.51/hr, with the middle 80% of counties paying between $90.41 and $93.51/hr. The highest state average is Nevada at $90.41/hr; the lowest is Nevada at $90.41/hr.
Range: $62.55 – $93.51/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051 — Electrical Power-Line Installers and Repairers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
10 county-level rates for LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Clark | NV | building | $68.11 | $25.40 | $93.51 | WD → |
| Clark | NV | heavy | $68.11 | $25.40 | $93.51 | WD → |
| Clark | NV | highway | $68.11 | $25.40 | $93.51 | WD → |
| Clark | NV | heavy | $43.04 | $19.51 | $62.55 | WD → |
| Lincoln | NV | heavy | $68.11 | $25.40 | $93.51 | WD → |
| Lincoln | NV | building | $68.11 | $25.40 | $93.51 | WD → |
| Lincoln | NV | highway | $68.11 | $25.40 | $93.51 | WD → |
| Nye | NV | heavy | $68.11 | $25.40 | $93.51 | WD → |
| Nye | NV | highway | $68.11 | $25.40 | $93.51 | WD → |
| Nye | NV | building | $68.11 | $25.40 | $93.51 | WD → |