LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTURO — Prevailing Wage Rates

Davis-Bacon prevailing wages for LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 4 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTURO is $24.60/hr, with the middle 80% of counties paying between $24.60 and $24.60/hr. The highest state average is California at $24.60/hr; the lowest is California at $24.60/hr.

Bottom 10%
$24.60
Median
$24.60
Average
$24.60
Top 10%
$24.60

Range: $24.60 – $24.60/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051Electrical Power-Line Installers and Repairers.

Davis-Bacon median
$24.60/hr
National median total package (base + fringe)
BLS OEWS market median
$44.50/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-44.7%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $20.63/hr
Avg total: $24.60/hr
4 rates

All Rates

4 county-level rates for LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTURO, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Del Norte CA building $20.63 $3.97 $24.60 WD →
Humboldt CA building $20.63 $3.97 $24.60 WD →
Lake CA building $20.63 $3.97 $24.60 WD →
Mendocino CA building $20.63 $3.97 $24.60 WD →
Top-paying counties for LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTURO →