LINE CONSTRUCTION: EQUIPMENT OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY — Prevailing Wage Rates

Davis-Bacon prevailing wages for LINE CONSTRUCTION: EQUIPMENT OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAYs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION: EQUIPMENT OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY is $72.95/hr, with the middle 80% of counties paying between $72.95 and $72.95/hr. The highest state average is Illinois at $72.95/hr; the lowest is Illinois at $72.95/hr.

Bottom 10%
$72.95
Median
$72.95
Average
$72.95
Top 10%
$72.95

Range: $72.95 – $72.95/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051Electrical Power-Line Installers and Repairers.

Davis-Bacon median
$72.95/hr
National median total package (base + fringe)
BLS OEWS market median
$44.50/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+63.9%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $49.22/hr
Avg total: $72.95/hr
16 rates

All Rates

16 county-level rates for LINE CONSTRUCTION: EQUIPMENT OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Boone IL heavy $49.22 $23.73 $72.95 WD →
Boone IL highway $49.22 $23.73 $72.95 WD →
De Kalb IL highway $49.22 $23.73 $72.95 WD →
De Kalb IL heavy $49.22 $23.73 $72.95 WD →
Du Page IL heavy $49.22 $23.73 $72.95 WD →
Du Page IL highway $49.22 $23.73 $72.95 WD →
Kane IL highway $49.22 $23.73 $72.95 WD →
Kane IL heavy $49.22 $23.73 $72.95 WD →
Kendall IL heavy $49.22 $23.73 $72.95 WD →
Kendall IL highway $49.22 $23.73 $72.95 WD →
Lake IL heavy $49.22 $23.73 $72.95 WD →
Lake IL highway $49.22 $23.73 $72.95 WD →
McHenry IL highway $49.22 $23.73 $72.95 WD →
McHenry IL heavy $49.22 $23.73 $72.95 WD →
Will IL heavy $49.22 $23.73 $72.95 WD →
Will IL highway $49.22 $23.73 $72.95 WD →
Top-paying counties for LINE CONSTRUCTION: EQUIPMENT OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY →