LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGNs across all covered states and counties. Rates vary by location and construction type.
Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN is $64.33/hr, with the middle 80% of counties paying between $64.33 and $64.33/hr. The highest state average is Illinois at $64.33/hr; the lowest is Illinois at $64.33/hr.
Range: $64.33 – $64.33/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
20 county-level rates for LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Fulton | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Fulton | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Hancock | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Hancock | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Henderson | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Henderson | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Knox | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Knox | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| McDonough | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| McDonough | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Mercer | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Mercer | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Peoria | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Peoria | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Stark | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Stark | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Tazewell | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Tazewell | IL | highway | $36.23 | $28.10 | $64.33 | WD → |
| Warren | IL | heavy | $36.23 | $28.10 | $64.33 | WD → |
| Warren | IL | highway | $36.23 | $28.10 | $64.33 | WD → |