LABORERS: GROUP 3: INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REME — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORERS: GROUP 3: INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 2 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS: GROUP 3: INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REME is $72.30/hr, with the middle 80% of counties paying between $72.30 and $72.30/hr. The highest state average is New York at $72.30/hr; the lowest is New York at $72.30/hr.

Bottom 10%
$72.30
Median
$72.30
Average
$72.30
Top 10%
$72.30

Range: $72.30 – $72.30/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$72.30/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+221.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $41.90/hr
Avg total: $72.30/hr
2 rates

All Rates

2 county-level rates for LABORERS: GROUP 3: INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REME, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Otsego NY heavy $41.90 $30.40 $72.30 WD →
Otsego NY highway $41.90 $30.40 $72.30 WD →
Top-paying counties for LABORERS: GROUP 3: INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REME →