LABORERS: GROUP 3 AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTING — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORERS: GROUP 3 AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTINGs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS: GROUP 3 AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTING is $45.62/hr, with the middle 80% of counties paying between $45.62 and $45.62/hr. The highest state average is Indiana at $45.62/hr; the lowest is Indiana at $45.62/hr.
Range: $45.62 – $45.62/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
15 county-level rates for LABORERS: GROUP 3 AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTING, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $28.40 | $17.22 | $45.62 | WD → |
| La Porte | IN | highway | $28.40 | $17.22 | $45.62 | WD → |
| La Porte | IN | heavy | $28.40 | $17.22 | $45.62 | WD → |
| Lake | IN | heavy | $28.40 | $17.22 | $45.62 | WD → |
| Lake | IN | building | $28.40 | $17.22 | $45.62 | WD → |
| Lake | IN | highway | $28.40 | $17.22 | $45.62 | WD → |
| Porter | IN | heavy | $28.40 | $17.22 | $45.62 | WD → |
| Porter | IN | building | $28.40 | $17.22 | $45.62 | WD → |
| Porter | IN | highway | $28.40 | $17.22 | $45.62 | WD → |
| St Joseph | IN | heavy | $28.40 | $17.22 | $45.62 | WD → |
| St Joseph | IN | building | $28.40 | $17.22 | $45.62 | WD → |
| St Joseph | IN | building | $28.40 | $17.22 | $45.62 | WD → |
| St Joseph | IN | highway | $28.40 | $17.22 | $45.62 | WD → |
| St Joseph | IN | highway | $28.40 | $17.22 | $45.62 | WD → |
| St Joseph | IN | heavy | $28.40 | $17.22 | $45.62 | WD → |