LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; PORTABLE WATER PUMPS WITH DISCHARGE U — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; PORTABLE WATER PUMPS WITH DISCHARGE Us across all covered states and counties. Rates vary by location and construction type.
Across 17 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; PORTABLE WATER PUMPS WITH DISCHARGE U is $46.93/hr, with the middle 80% of counties paying between $46.93 and $46.93/hr. The highest state average is Indiana at $46.93/hr; the lowest is Indiana at $46.93/hr.
Range: $46.93 – $46.93/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
17 county-level rates for LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; RAILROAD WORKERS; MASONRY WALL WASHERS; PORTABLE WATER PUMPS WITH DISCHARGE U, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Brown | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Clark | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Dearborn | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Decatur | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Fayette | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Floyd | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Franklin | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Harrison | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Henry | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Jennings | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Ohio | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Randolph | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Ripley | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Rush | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Switzerland | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Union | IN | building | $28.38 | $18.55 | $46.93 | WD → |
| Wayne | IN | building | $28.38 | $18.55 | $46.93 | WD → |