LABORER ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORER ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATEs across all covered states and counties. Rates vary by location and construction type.
Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE is $93.18/hr, with the middle 80% of counties paying between $93.18 and $93.18/hr. The highest state average is Nevada at $93.18/hr; the lowest is Nevada at $93.18/hr.
Range: $93.18 – $93.18/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
9 county-level rates for LABORER ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Clark | NV | heavy | $64.37 | $28.81 | $93.18 | WD → |
| Clark | NV | building | $64.37 | $28.81 | $93.18 | WD → |
| Clark | NV | highway | $64.37 | $28.81 | $93.18 | WD → |
| Lincoln | NV | heavy | $64.37 | $28.81 | $93.18 | WD → |
| Lincoln | NV | building | $64.37 | $28.81 | $93.18 | WD → |
| Lincoln | NV | highway | $64.37 | $28.81 | $93.18 | WD → |
| Nye | NV | building | $64.37 | $28.81 | $93.18 | WD → |
| Nye | NV | highway | $64.37 | $28.81 | $93.18 | WD → |
| Nye | NV | heavy | $64.37 | $28.81 | $93.18 | WD → |