LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TOs across all covered states and counties. Rates vary by location and construction type.
Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO is $86.70/hr, with the middle 80% of counties paying between $86.70 and $86.70/hr. The highest state average is Illinois at $86.70/hr; the lowest is Illinois at $86.70/hr.
Range: $86.70 – $86.70/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
16 county-level rates for LABORER: SKILLED LABORER SKILLED LABORER: ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Boone | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Boone | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| De Kalb | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| De Kalb | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Du Page | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Du Page | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| Kane | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| Kane | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Kendall | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Kendall | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| Lake | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Lake | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| McHenry | IL | highway | $50.39 | $36.31 | $86.70 | WD → |
| McHenry | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Will | IL | heavy | $50.39 | $36.31 | $86.70 | WD → |
| Will | IL | highway | $50.39 | $36.31 | $86.70 | WD → |