LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONALs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL is $72.14/hr, with the middle 80% of counties paying between $72.14 and $72.14/hr. The highest state average is California at $72.14/hr; the lowest is California at $72.14/hr.
Range: $72.14 – $72.14/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
15 county-level rates for LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Los Angeles | CA | building | $46.17 | $25.97 | $72.14 | WD → |
| Los Angeles | CA | highway | $46.17 | $25.97 | $72.14 | WD → |
| Los Angeles | CA | heavy | $46.17 | $25.97 | $72.14 | WD → |
| Orange | CA | highway | $46.17 | $25.97 | $72.14 | WD → |
| Orange | CA | heavy | $46.17 | $25.97 | $72.14 | WD → |
| Orange | CA | building | $46.17 | $25.97 | $72.14 | WD → |
| Riverside | CA | highway | $46.17 | $25.97 | $72.14 | WD → |
| Riverside | CA | building | $46.17 | $25.97 | $72.14 | WD → |
| Riverside | CA | heavy | $46.17 | $25.97 | $72.14 | WD → |
| San Luis Obispo | CA | highway | $46.17 | $25.97 | $72.14 | WD → |
| San Luis Obispo | CA | heavy | $46.17 | $25.97 | $72.14 | WD → |
| San Luis Obispo | CA | building | $46.17 | $25.97 | $72.14 | WD → |
| Ventura | CA | building | $46.17 | $25.97 | $72.14 | WD → |
| Ventura | CA | highway | $46.17 | $25.97 | $72.14 | WD → |
| Ventura | CA | heavy | $46.17 | $25.97 | $72.14 | WD → |