LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MANs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN is $65.65/hr, with the middle 80% of counties paying between $65.65 and $65.65/hr. The highest state average is Rhode Island at $65.65/hr; the lowest is Rhode Island at $65.65/hr.

Bottom 10%
$65.65
Median
$65.65
Average
$65.65
Top 10%
$65.65

Range: $65.65 – $65.65/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$65.65/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+192.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Rhode Island RI
Avg base: $41.50/hr
Avg total: $65.65/hr
15 rates

All Rates

15 county-level rates for LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Bristol RI building $41.50 $24.15 $65.65 WD →
Bristol RI heavy $41.50 $24.15 $65.65 WD →
Bristol RI highway $41.50 $24.15 $65.65 WD →
Kent RI building $41.50 $24.15 $65.65 WD →
Kent RI highway $41.50 $24.15 $65.65 WD →
Kent RI heavy $41.50 $24.15 $65.65 WD →
Newport RI heavy $41.50 $24.15 $65.65 WD →
Newport RI building $41.50 $24.15 $65.65 WD →
Newport RI highway $41.50 $24.15 $65.65 WD →
Providence RI building $41.50 $24.15 $65.65 WD →
Providence RI heavy $41.50 $24.15 $65.65 WD →
Providence RI highway $41.50 $24.15 $65.65 WD →
Washington RI highway $41.50 $24.15 $65.65 WD →
Washington RI heavy $41.50 $24.15 $65.65 WD →
Washington RI building $41.50 $24.15 $65.65 WD →
Top-paying counties for LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW BOTTOM MAN →