LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRY — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRYs across all covered states and counties. Rates vary by location and construction type.
Across 14 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRY is $88.74/hr, with the middle 80% of counties paying between $88.74 and $88.74/hr. The highest state average is Illinois at $88.74/hr; the lowest is Illinois at $88.74/hr.
Range: $88.74 – $88.74/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
14 county-level rates for LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRY, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Du Page | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Du Page | IL | residential | $51.80 | $36.94 | $88.74 | WD → |
| Grundy | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Grundy | IL | residential | $51.80 | $36.94 | $88.74 | WD → |
| Kane | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Kane | IL | residential | $51.80 | $36.94 | $88.74 | WD → |
| Kendall | IL | residential | $51.80 | $36.94 | $88.74 | WD → |
| Kendall | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Lake | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Lake | IL | residential | $51.80 | $36.94 | $88.74 | WD → |
| McHenry | IL | residential | $51.80 | $36.94 | $88.74 | WD → |
| McHenry | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Will | IL | building | $51.80 | $36.94 | $88.74 | WD → |
| Will | IL | residential | $51.80 | $36.94 | $88.74 | WD → |