LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER; LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL COUNTIES) — Prevailing Wage Rates
Davis-Bacon prevailing wages for LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER; LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL COUNTIES)s across all covered states and counties. Rates vary by location and construction type.
Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER; LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL COUNTIES) is $76.21/hr, with the middle 80% of counties paying between $76.21 and $76.21/hr. The highest state average is Illinois at $76.21/hr; the lowest is Illinois at $76.21/hr.
Range: $76.21 – $76.21/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061 — Construction Laborers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
20 county-level rates for LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER; LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL COUNTIES), ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Fulton | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Fulton | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Hancock | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Hancock | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Henderson | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Henderson | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Knox | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Knox | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| McDonough | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| McDonough | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Mercer | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Mercer | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Peoria | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Peoria | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Stark | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Stark | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Tazewell | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Tazewell | IL | highway | $38.07 | $38.14 | $76.21 | WD → |
| Warren | IL | heavy | $38.07 | $38.14 | $76.21 | WD → |
| Warren | IL | highway | $38.07 | $38.14 | $76.21 | WD → |