LABORER GROUP 2 LABORER - GENERAL, DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT, GAS & OIL PIPELINE, W — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER GROUP 2 LABORER - GENERAL, DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT, GAS & OIL PIPELINE, Ws across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER GROUP 2 LABORER - GENERAL, DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT, GAS & OIL PIPELINE, W is $76.69/hr, with the middle 80% of counties paying between $76.69 and $76.69/hr. The highest state average is Nevada at $76.69/hr; the lowest is Nevada at $76.69/hr.

Bottom 10%
$76.69
Median
$76.69
Average
$76.69
Top 10%
$76.69

Range: $76.69 – $76.69/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$76.69/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+241.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Nevada NV
Avg base: $47.34/hr
Avg total: $76.69/hr
9 rates

All Rates

9 county-level rates for LABORER GROUP 2 LABORER - GENERAL, DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT, GAS & OIL PIPELINE, W, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Clark NV heavy $47.34 $29.35 $76.69 WD →
Clark NV building $47.34 $29.35 $76.69 WD →
Clark NV highway $47.34 $29.35 $76.69 WD →
Lincoln NV heavy $47.34 $29.35 $76.69 WD →
Lincoln NV building $47.34 $29.35 $76.69 WD →
Lincoln NV highway $47.34 $29.35 $76.69 WD →
Nye NV building $47.34 $29.35 $76.69 WD →
Nye NV highway $47.34 $29.35 $76.69 WD →
Nye NV heavy $47.34 $29.35 $76.69 WD →
Top-paying counties for LABORER GROUP 2 LABORER - GENERAL, DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT, GAS & OIL PIPELINE, W →