LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN HEAD STRING OR WIRELINE MAN, PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN HEAD STRING OR WIRELINE MAN, PIPE SETTER ON SEWER OR WATER MAIN, GUNNITEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 40 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN HEAD STRING OR WIRELINE MAN, PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE is $57.87/hr, with the middle 80% of counties paying between $57.87 and $57.87/hr. The highest state average is Illinois at $57.87/hr; the lowest is Illinois at $57.87/hr.

Bottom 10%
$57.87
Median
$57.87
Average
$57.87
Top 10%
$57.87

Range: $57.87 – $57.87/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$57.87/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+157.5%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $34.27/hr
Avg total: $57.87/hr
40 rates

All Rates

40 county-level rates for LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN HEAD STRING OR WIRELINE MAN, PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Bureau IL highway $34.27 $23.60 $57.87 WD →
Bureau IL heavy $34.27 $23.60 $57.87 WD →
Carroll IL heavy $34.27 $23.60 $57.87 WD →
Carroll IL highway $34.27 $23.60 $57.87 WD →
Fulton IL heavy $34.27 $23.60 $57.87 WD →
Fulton IL highway $34.27 $23.60 $57.87 WD →
Hancock IL heavy $34.27 $23.60 $57.87 WD →
Hancock IL highway $34.27 $23.60 $57.87 WD →
Henderson IL heavy $34.27 $23.60 $57.87 WD →
Henderson IL highway $34.27 $23.60 $57.87 WD →
Henry IL heavy $34.27 $23.60 $57.87 WD →
Henry IL highway $34.27 $23.60 $57.87 WD →
Jo Daviess IL heavy $34.27 $23.60 $57.87 WD →
Jo Daviess IL highway $34.27 $23.60 $57.87 WD →
Knox IL highway $34.27 $23.60 $57.87 WD →
Knox IL heavy $34.27 $23.60 $57.87 WD →
Lee IL heavy $34.27 $23.60 $57.87 WD →
Lee IL highway $34.27 $23.60 $57.87 WD →
McDonough IL heavy $34.27 $23.60 $57.87 WD →
McDonough IL highway $34.27 $23.60 $57.87 WD →
Mercer IL heavy $34.27 $23.60 $57.87 WD →
Mercer IL highway $34.27 $23.60 $57.87 WD →
Ogle IL highway $34.27 $23.60 $57.87 WD →
Ogle IL heavy $34.27 $23.60 $57.87 WD →
Peoria IL highway $34.27 $23.60 $57.87 WD →
Peoria IL heavy $34.27 $23.60 $57.87 WD →
Rock Island IL heavy $34.27 $23.60 $57.87 WD →
Rock Island IL highway $34.27 $23.60 $57.87 WD →
Stark IL highway $34.27 $23.60 $57.87 WD →
Stark IL heavy $34.27 $23.60 $57.87 WD →
Stephenson IL heavy $34.27 $23.60 $57.87 WD →
Stephenson IL highway $34.27 $23.60 $57.87 WD →
Tazewell IL heavy $34.27 $23.60 $57.87 WD →
Tazewell IL highway $34.27 $23.60 $57.87 WD →
Warren IL heavy $34.27 $23.60 $57.87 WD →
Warren IL highway $34.27 $23.60 $57.87 WD →
Whiteside IL heavy $34.27 $23.60 $57.87 WD →
Whiteside IL highway $34.27 $23.60 $57.87 WD →
Winnebago IL heavy $34.27 $23.60 $57.87 WD →
Winnebago IL highway $34.27 $23.60 $57.87 WD →
Top-paying counties for LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN HEAD STRING OR WIRELINE MAN, PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE →