LABORER COMPRESSED AIR GROUP 2 — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER COMPRESSED AIR GROUP 2s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER COMPRESSED AIR GROUP 2 is $77.08/hr, with the middle 80% of counties paying between $77.08 and $77.08/hr. The highest state average is Rhode Island at $77.08/hr; the lowest is Rhode Island at $77.08/hr.

Bottom 10%
$77.08
Median
$77.08
Average
$77.08
Top 10%
$77.08

Range: $77.08 – $77.08/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$77.08/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+243%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Rhode Island RI
Avg base: $52.93/hr
Avg total: $77.08/hr
15 rates

All Rates

15 county-level rates for LABORER COMPRESSED AIR GROUP 2, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Bristol RI building $52.93 $24.15 $77.08 WD →
Bristol RI heavy $52.93 $24.15 $77.08 WD →
Bristol RI highway $52.93 $24.15 $77.08 WD →
Kent RI building $52.93 $24.15 $77.08 WD →
Kent RI highway $52.93 $24.15 $77.08 WD →
Kent RI heavy $52.93 $24.15 $77.08 WD →
Newport RI heavy $52.93 $24.15 $77.08 WD →
Newport RI building $52.93 $24.15 $77.08 WD →
Newport RI highway $52.93 $24.15 $77.08 WD →
Providence RI building $52.93 $24.15 $77.08 WD →
Providence RI heavy $52.93 $24.15 $77.08 WD →
Providence RI highway $52.93 $24.15 $77.08 WD →
Washington RI highway $52.93 $24.15 $77.08 WD →
Washington RI heavy $52.93 $24.15 $77.08 WD →
Washington RI building $52.93 $24.15 $77.08 WD →
Top-paying counties for LABORER COMPRESSED AIR GROUP 2 →