LABORER: COMMON OR GENERAL, INCLUDING CONCRETE WORK — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER: COMMON OR GENERAL, INCLUDING CONCRETE WORKs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER: COMMON OR GENERAL, INCLUDING CONCRETE WORK is $10.24/hr, with the middle 80% of counties paying between $10.24 and $10.42/hr. The highest state average is Mississippi at $10.28/hr; the lowest is Mississippi at $10.28/hr.

Bottom 10%
$10.24
Median
$10.24
Average
$10.28
Top 10%
$10.42

Range: $10.24 – $10.46/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$10.24/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-54.4%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Mississippi MS
Avg base: $10.28/hr
Avg total: $10.28/hr
9 rates

All Rates

9 county-level rates for LABORER: COMMON OR GENERAL, INCLUDING CONCRETE WORK, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Claiborne MS highway $10.24 $0.00 $10.24 WD →
Covington MS highway $10.24 $0.00 $10.24 WD →
Franklin MS highway $10.24 $0.00 $10.24 WD →
Issaquena MS highway $10.24 $0.00 $10.24 WD →
Jefferson MS highway $10.46 $0.00 $10.46 WD →
Pike MS highway $10.41 $0.00 $10.41 WD →
Sharkey MS highway $10.24 $0.00 $10.24 WD →
Walthall MS highway $10.24 $0.00 $10.24 WD →
Wilkinson MS highway $10.24 $0.00 $10.24 WD →
Top-paying counties for LABORER: COMMON OR GENERAL, INCLUDING CONCRETE WORK →