IRONWORKER: SHEETER (DU PAGE, LAKE, AND MCHENRY COUNTIES) — Prevailing Wage Rates
Davis-Bacon prevailing wages for IRONWORKER: SHEETER (DU PAGE, LAKE, AND MCHENRY COUNTIES)s across all covered states and counties. Rates vary by location and construction type.
Across 30 Davis-Bacon rate records nationwide, the median total package (base + fringe) for IRONWORKER: SHEETER (DU PAGE, LAKE, AND MCHENRY COUNTIES) is $109.29/hr, with the middle 80% of counties paying between $109.29 and $109.29/hr. The highest state average is Illinois at $109.29/hr; the lowest is Illinois at $109.29/hr.
Range: $109.29 – $109.29/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2221 — Structural Iron and Steel Workers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
30 county-level rates for IRONWORKER: SHEETER (DU PAGE, LAKE, AND MCHENRY COUNTIES), ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Boone | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| Boone | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| De Kalb | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| De Kalb | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| Du Page | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| Du Page | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| Du Page | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| Du Page | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| Grundy | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| Grundy | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| Kane | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| Kane | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| Kane | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| Kane | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| Kendall | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| Kendall | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| Kendall | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| Kendall | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| Lake | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| Lake | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| Lake | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| Lake | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| McHenry | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| McHenry | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| McHenry | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |
| McHenry | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| Will | IL | building | $62.71 | $46.58 | $109.29 | WD → |
| Will | IL | highway | $62.71 | $46.58 | $109.29 | WD → |
| Will | IL | residential | $62.71 | $46.58 | $109.29 | WD → |
| Will | IL | heavy | $62.71 | $46.58 | $109.29 | WD → |