HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF — Prevailing Wage Rates

Davis-Bacon prevailing wages for HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OFs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 6 Davis-Bacon rate records nationwide, the median total package (base + fringe) for HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF is $63.54/hr, with the middle 80% of counties paying between $63.54 and $63.54/hr. The highest state average is New York at $63.54/hr; the lowest is New York at $63.54/hr.

Bottom 10%
$63.54
Median
$63.54
Average
$63.54
Top 10%
$63.54

Range: $63.54 – $63.54/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

New York NY
Avg base: $38.50/hr
Avg total: $63.54/hr
6 rates

All Rates

6 county-level rates for HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Broome NY building $38.50 $25.04 $63.54 WD →
Broome NY heavy $38.50 $25.04 $63.54 WD →
Broome NY highway $38.50 $25.04 $63.54 WD →
Chenango NY building $38.50 $25.04 $63.54 WD →
Chenango NY heavy $38.50 $25.04 $63.54 WD →
Chenango NY highway $38.50 $25.04 $63.54 WD →
Top-paying counties for HAZARDOUS MATERIAL HANDLER: SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF →