HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS — Prevailing Wage Rates
Davis-Bacon prevailing wages for HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALSs across all covered states and counties. Rates vary by location and construction type.
Across 23 Davis-Bacon rate records nationwide, the median total package (base + fringe) for HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS is $72.13/hr, with the middle 80% of counties paying between $72.13 and $72.13/hr. The highest state average is Indiana at $72.13/hr; the lowest is Indiana at $72.13/hr.
Range: $72.13 – $72.13/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
23 county-level rates for HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Elkhart | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Jasper | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Kosciusko | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| La Porte | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| La Porte | IN | heavy | $41.20 | $30.93 | $72.13 | WD → |
| La Porte | IN | highway | $41.20 | $30.93 | $72.13 | WD → |
| Lagrange | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Lake | IN | heavy | $41.20 | $30.93 | $72.13 | WD → |
| Lake | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Lake | IN | highway | $41.20 | $30.93 | $72.13 | WD → |
| Marshall | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Newton | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Porter | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Porter | IN | heavy | $41.20 | $30.93 | $72.13 | WD → |
| Porter | IN | highway | $41.20 | $30.93 | $72.13 | WD → |
| Pulaski | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| St Joseph | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| St Joseph | IN | highway | $41.20 | $30.93 | $72.13 | WD → |
| St Joseph | IN | highway | $41.20 | $30.93 | $72.13 | WD → |
| St Joseph | IN | heavy | $41.20 | $30.93 | $72.13 | WD → |
| St Joseph | IN | heavy | $41.20 | $30.93 | $72.13 | WD → |
| St Joseph | IN | building | $41.20 | $30.93 | $72.13 | WD → |
| Starke | IN | building | $41.20 | $30.93 | $72.13 | WD → |