HAZARDOUS MATERIAL HANDLER Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation ma — Prevailing Wage Rates
Davis-Bacon prevailing wages for HAZARDOUS MATERIAL HANDLER Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation mas across all covered states and counties. Rates vary by location and construction type.
Across 12 Davis-Bacon rate records nationwide, the median total package (base + fringe) for HAZARDOUS MATERIAL HANDLER Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation ma is $95.92/hr, with the middle 80% of counties paying between $95.92 and $95.92/hr. The highest state average is New York at $95.92/hr; the lowest is New York at $95.92/hr.
Range: $95.92 – $95.92/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
12 county-level rates for HAZARDOUS MATERIAL HANDLER Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation ma, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Dutchess | NY | building | $46.62 | $49.30 | $95.92 | WD → |
| Dutchess | NY | highway | $46.62 | $49.30 | $95.92 | WD → |
| Dutchess | NY | heavy | $46.62 | $49.30 | $95.92 | WD → |
| Orange | NY | building | $46.62 | $49.30 | $95.92 | WD → |
| Orange | NY | highway | $46.62 | $49.30 | $95.92 | WD → |
| Orange | NY | heavy | $46.62 | $49.30 | $95.92 | WD → |
| Sullivan | NY | heavy | $46.62 | $49.30 | $95.92 | WD → |
| Sullivan | NY | building | $46.62 | $49.30 | $95.92 | WD → |
| Sullivan | NY | highway | $46.62 | $49.30 | $95.92 | WD → |
| Ulster | NY | building | $46.62 | $49.30 | $95.92 | WD → |
| Ulster | NY | highway | $46.62 | $49.30 | $95.92 | WD → |
| Ulster | NY | heavy | $46.62 | $49.30 | $95.92 | WD → |