GLAZIER (LAKE, LAPORTE AND PORTER COUNTIES) — Prevailing Wage Rates

Davis-Bacon prevailing wages for GLAZIER (LAKE, LAPORTE AND PORTER COUNTIES)s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for GLAZIER (LAKE, LAPORTE AND PORTER COUNTIES) is $74.72/hr, with the middle 80% of counties paying between $74.72 and $74.72/hr. The highest state average is Indiana at $74.72/hr; the lowest is Indiana at $74.72/hr.

Bottom 10%
$74.72
Median
$74.72
Average
$74.72
Top 10%
$74.72

Range: $74.72 – $74.72/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2121Glaziers.

Davis-Bacon median
$74.72/hr
National median total package (base + fringe)
BLS OEWS market median
$26.65/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+180.4%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $44.09/hr
Avg total: $74.72/hr
15 rates

All Rates

15 county-level rates for GLAZIER (LAKE, LAPORTE AND PORTER COUNTIES), ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
La Porte IN building $44.09 $30.63 $74.72 WD →
La Porte IN highway $44.09 $30.63 $74.72 WD →
La Porte IN heavy $44.09 $30.63 $74.72 WD →
Lake IN heavy $44.09 $30.63 $74.72 WD →
Lake IN building $44.09 $30.63 $74.72 WD →
Lake IN highway $44.09 $30.63 $74.72 WD →
Porter IN heavy $44.09 $30.63 $74.72 WD →
Porter IN building $44.09 $30.63 $74.72 WD →
Porter IN highway $44.09 $30.63 $74.72 WD →
St Joseph IN heavy $44.09 $30.63 $74.72 WD →
St Joseph IN building $44.09 $30.63 $74.72 WD →
St Joseph IN building $44.09 $30.63 $74.72 WD →
St Joseph IN highway $44.09 $30.63 $74.72 WD →
St Joseph IN highway $44.09 $30.63 $74.72 WD →
St Joseph IN heavy $44.09 $30.63 $74.72 WD →
Top-paying counties for GLAZIER (LAKE, LAPORTE AND PORTER COUNTIES) →